19
Specific steps are as follows:
1) open the CMP integrated management platform and enter the main interface of the
functional panel;
2) select the "OSD switch" option, check the OSD switch and return to the main
interface of the functional panel;
3) select the "Multi-View" option to enter the large-screen divide interface;
4) set the required number of divide boxes (1, 4, 16, 25, 36);
5) select the Decoder device to be divided according to the IP address displayed by
OSD;
6) open the Decoder device list in the monitoring point area (left side), select the
required Decoder device, and long press the left mouse button to drag it into the divide
box;
7) open the Encoder device list in the monitoring point area, select the required
Encoder device, and long press the left mouse button to drag it into the divide box;
8) large screen divide operation is completed.
Note: if the Decoder returns to normal one-to-many or many-to-many, it can be
restored by re-entering the matrix configuration. Exit will prompt you to save the view.
7.3. Video Wall
Video Wall consists of a single signal source splicing multiple sets of Decoder (TV)
into a single image.See the example image below
1). Under Video Wall, the maximum resolution of each group of Decoder devices
supports 4K30.
2). The current maximum support is 9×9 splicing
3). Edge shielding (screen width, screen height, display width and display height) can
be set separately for each group of spliced images.