C-Tech ZHY-401B Скачать руководство пользователя страница 10

- 8 -

undersurface of outer sleeve and top of nesting plate is 0mm. Keep the cover in place, close the
swinging arm and turn adjusting bolt to make the space 1 mm with the cover. Lock the locknut (4
of Fig.2).

Inspect and adjust the setting of pressure and adjust the time of holding pressure

.

Adjust the falliing space of press head: Open the swinging arm (4 of Fig.1),Push the start
button.The press head will move up to the top, and then will move down slightly. The press head
will then stop. Put the funnel in the Boric acid tool. Adjust the other parameter on the PLC to
make sure the falling space is 1~2 mm. Refer Fig.7. The adjusting method is as Charpter “About
PLC ”in page 12.

Try to press one sample. The operation step is as flow chart of Fig.8 in page 10.

According to the need, adjust the sample removal time. The default time is 4 seconds.The
method to press sample with aluminum cup is same as with boric acid expect filling sample by
aluminum cup not boric acid.

Fig.7

Fig.6

Press head

Press tool coat

Funnel

Содержание ZHY-401B

Страница 1: ...ZHY 401B 601B Press Machine...

Страница 2: ...NTENTS I Preface 1 II Safety Issues 2 III General Information 2 IV Installation 5 V Maintenance Instruction 15 VI Fault Analysis 16 VII Main Technical Specifications 17 VIII About the Warranty Period...

Страница 3: ...so the operation instructions will be changed also All changes from now on will be done without separately notice Please must pay attention to the following warnings Risk of shock Warning against dang...

Страница 4: ...teel ring whose dimension is 40 35 15 mm is 200KN and the thick wall whose dimension is 45 35 15 mm is 350KN In order to guarantee the normal work please carry out regular inspection and maintenance I...

Страница 5: ...acid press samples more convenient by improved boric acid mould structure and perfect action program The integrated hydraulic pipeline module with special design not only makes assembly more convenien...

Страница 6: ...tart button 2 Stop button 3 Lifting button 4 PLC touch screen 5 Exit mould Falling button 1 Air filter 2 Downward solenoid valve 3 Upward solenoid valve 4 Pressure sensor 5 Low speed solenoid valve 6...

Страница 7: ...rvice life of the oil pump please i do not use any other type of hydraulic oil which we don t permit and ensure the cleaning and quality of the oil Before use please wipe off the antirust oil on the s...

Страница 8: ...r need During the procedure the friction of hydraulic oil will increase and the oil temperature will rise quickly In order to extend the service life of hydraulic oil the speed of adding pressure shou...

Страница 9: ...e sundries on the piston rod and press head Put the seating plane of press head into central pit of tool tray 4 of Fig 5 carefully and screw on the round nut 3 of Fig 5 by special socket spanner 1 of...

Страница 10: ...ove up to the top and then will move down slightly The press head will then stop Put the funnel in the Boric acid tool Adjust the other parameter on the PLC to make sure the falling space is 1 2 mm Re...

Страница 11: ...as flow chart of Fig 9 in page 11 Set the falling time of press head After exit mould the press mould coat should fall to the position of positioning step and the press cover should just leave the adj...

Страница 12: ...Switch on the swinging arm Push the start button to press sample After finish open the swinging arm Press the button to exit mould Remove the cover and sample The press head moves down quickly Clear u...

Страница 13: ...ay the swinging arm and don t see the mould with eye level The spare parts should be handled with care Specially the display window of PLC can t be incurred by other things Put the steel ring Fill sam...

Страница 14: ...pressing the stop button the motor will stop and all valves will reset The operation of Touch screen is as followed Display the homepage as followed when starting Type identify It is used to show typ...

Страница 15: ...d delay setting Set the holding pressure and holding time according to your need Count It will count automatically every time Press clear button Zero clearing count will be reset to 0 Other Press this...

Страница 16: ...y Demould Plastic ring It is the time for the tray drop to the bottom automatically after finish plastic ring pressing Slow decompression It is delay time of slow decompression stage after finish the...

Страница 17: ...he equipment work in room temperature range 10 to 40 Our oil tank adopts leak proof structure to make sure the cleaning of hydraulic oil in oil tank and avoid polluted hydraulic oil flowing into oil t...

Страница 18: ...ay alve iscontaminated 2 Upward solenoid valve fault 3 Cylinder piston seal fault 1 Replace one way valve 2 Replace solenoid valve 3 Replace cylinder piston seal The pressure cannot keep in place and...

Страница 19: ...pply then replace the SSR check oil pump There is unusual sound when exiting mould The mould has not been cleaned for a long time Clean the mould per shift and use grease to spread on cylindrical surf...

Страница 20: ...ntrary to the operating or maintenance instructions as specified in the user manual This warranty does not cover any unit that has been altered or modified so as to change its intended use The warrant...

Страница 21: ...19...

Страница 22: ...20...

Отзывы: