background image

6  

 

Wiring diagrams 

  EBMINT-DD 

 

When power is applied to the unit, the load will turn on immediately. 

 

Set the timeout to 10 seconds, vacate the room or remain very still and wait for the load to switch off . 

 

Check that the load switches on when movement is detected. 

 

The unit is now ready for programming. 

Power-up test procedure 

What if the load does not turn ON? 

 

Check that the live supply to the circuit is good.  

 

Check that the load is functioning by bypassing the sensor (e.g. link 

L

 and 

L/ Out

). 

HINT: 

The Walk Test LED function can be used to check that the unit is detecting movement in the required area. 

What if the load does not turn OFF? 

 

Ensure that the area is left unoccupied for longer than the Time Out Period. 

 

Ensure that the sensor is not adjacent to circulating air, heaters or lamps. 

 

If the unit “false triggers” reduce the sensitivity using the sensitivity settings  

Fault finding 

 EBMINT-PRM 

 EBMINT-AD 

Wire the products as shown in the diagrams.

 

Содержание EBMINT

Страница 1: ...al control using an infrared handset It is specifically designed for mounting onto a lamp or louvre using the louvre fitting bracket Three models are available premium direct dim and analogue dim all...

Страница 2: ...ection diagram Range Walk towards Walk across Height Range Diameter 7m 10m 2 8m 5m Height Range Diameter 7m 16m 2 8m 9m Note illustration shows an average of the walk across and walk towards figures b...

Страница 3: ...er s datasheet for details As the EBMINT DD AD are able to dim the lamps using DALI DSI or 1 10V the products provide a facility to disable this for a given period of time Operation By setting the Bur...

Страница 4: ...ube The cable must not touch the any part of the lamp 1 2 3 4 1 2 3 4 1 2 Louvre fitting Compact reflector fitting 1 2 3 4 Select correct clip for lamp T5 or T8 Panel mounting using lugs Use the lugs...

Страница 5: ...knockout or between gear tray and housing of luminaire Connect the Neutral Disconnect the Live to the ballast Using the supplied terminal block connect the Live switched output Black from detector to...

Страница 6: ...ive supply to the circuit is good Check that the load is functioning by bypassing the sensor e g link L and L Out HINT The Walk Test LED function can be used to check that the unit is detecting moveme...

Страница 7: ...g Note the Lux Off Level value must always be greater than the Lux On Level value Load Type DD only DALI 2 DALI 7 DSI 2 DALI on Sets the ballast control protocol to be used by the output channel Sensi...

Страница 8: ...e On Delay to allows the first channel to switch on after the second channel A typical application for this would be where a detector is controlling lighting and air conditioning in an area When the o...

Страница 9: ...then it is 10 Max Value 100 0 to 100 Maximum dimming output level Min Value 0 0 to 100 Minimum dimming output level Memorise N Yes or No If this is set to Yes the last manual lux level set will be me...

Страница 10: ...AD On 344mW Off 268mW Cable specification 1m silicon insulation and sheath PRM 3 x 0 75mm2 AD DD 3 x 0 75mm2 2 x 0 50mm2 Temperature 10 C to 50 C Humidity 5 to 95 non condensing Material Flame retarda...