6 / 24
6.
Layng on reinforced concrete foundation
In the event that the installation is performed on an existing or new construction concrete foundation,
the KIT provides for the installation of a special base in high density EPS.
Before proceeding with the assembly of the structure, check that the laying surface is sound and that
there are no cracks or detachment areas. It is good to check that the bottom is well leveled and
smooth.
If the foundation does not comply with these conditions, it will be necessary to restore the surface by
eliminating the defects, correcting their flatness.
The EPS base is made using modular elements to be positioned inside the tank
respecting the laying pattern,
look at
attached this document
TAV. 12A
Figura 2 Schema basamento di posa
How to assembly the base structure
7.
Arrange and mechanically connect together the elements that make up the basic structure. The
specially drilled omega beams are coupled using linear and angular plates using M12x110 bolts. The
basic structure is composed of the following elements, supplied in the indicated quantities:
The 500 mm long omega beams will be placed at the four corners of the swimming pool and on the side
on which the technical compartment will stand, where they will serve as a support for the buttresses in
support of the external finishing panels and the upper covering.
Look at attached
TAV. 06
.
06/12/2019
Ver.00
STRUTTURA DI BASE
Codice interno
Quantità
Componente
4030035
1
Trave omega 2162,5
4030036
6
Trave omega 1780
4030037
1
Trave omega 1742,5
4030038
8
Trave omega 500
4030039
4
Piastra lineare
4030040
4
Piastra angolo
MEDITERRANEA