Step 2
: Flip the PCB over so that the bottom or solder side is up. Insert the
three potentiometers, the two toggle switches, and the LED into the bottom
side of the PCB.
DO NOT SOLDER ANYTHING YET!!!
The LED will
have one lead that is longer than the other.
THIS WILL GO INTO THE
SQUARE SOLDER HOLE.
Don’t forget to remove the nuts and washers
from the pots and also to snap off the tabs before you do this step.
Содержание Large Beaver Ram's Head
Страница 16: ...Step 2 Install the 1 4 enclosed jacks to the enclosure...
Страница 20: ...Step 2 Wire the PCB to the foot switch and jacks as shown...
Страница 22: ...For hi res schematic visit http www byocelctronics com largebeaverramschematic pdf...
Страница 23: ...Please visit http byocelectronics com board for any technical support Copyright 2018 BYOC Inc...