2
HVS&HVM Operating Manual
Contents
Legal Provisions ......................................................................................................................................... 1
1.
Information on this Document ........................................................................................................ 5
1.1.
Validity ....................................................................................................................................... 5
1.2.
Target Group ............................................................................................................................ 5
1.3.
Content and Structure of this Document ............................................................................ 5
1.4.
Declaration of Conformity ..................................................................................................... 5
1.5.
Levels of Warning Messages .................................................................................................. 5
1.6.
Symbols in the Document ...................................................................................................... 6
1.7.
Designation in the Document................................................................................................ 6
2.
Safety .................................................................................................................................................... 7
2.1.
Intended Use ............................................................................................................................ 7
2.2.
IMPORTANT SAFETY INSTRUCTIONS .................................................................................... 7
2.2.1.
Battery Module Leakage .............................................................................................. 7
2.2.2.
Firefighting Measures .................................................................................................. 8
2.2.3.
Battery Modules Handling and Storage Guide ........................................................ 8
2.2.4.
Warning of Electric Shock ............................................................................................ 9
2.2.5.
Warning of Overvoltages ............................................................................................. 9
2.2.6.
Caution of Weight ......................................................................................................... 9
2.2.7.
Notice of Property Damage ...................................................................................... 10
3.
Scope of Delivery .............................................................................................................................. 11
4.
Battery System Overview ................................................................................................................ 12
4.1.
Battery System Description ................................................................................................. 12
4.2.
Interface .................................................................................................................................. 13
4.3.
Symbols on the System ........................................................................................................ 14
4.4.
LED Signals ............................................................................................................................. 16
5.
Installation ......................................................................................................................................... 17
5.1.
Requirements for Installation .............................................................................................. 17
5.1.1.
Requirements for Installation Location .................................................................. 17
5.1.2.
Tools ............................................................................................................................. 18
Страница 1: ......
Страница 2: ...t apply This document does not replace and is not intended to replace any local state provincial federal or national laws regulations or codes applicable to the installation electrical safety and use...
Страница 3: ...TANT SAFETY INSTRUCTIONS 7 2 2 1 Battery Module Leakage 7 2 2 2 Firefighting Measures 8 2 2 3 Battery Modules Handling and Storage Guide 8 2 2 4 Warning of Electric Shock 9 2 2 5 Warning of Overvoltag...
Страница 4: ...to an Inverter 26 6 4 1 Connection Options 26 6 4 2 Connecting the Data Cable of the Inverter 26 6 5 Connecting the Data Cable to other Battery System s 27 6 6 Connecting the Network Cables 30 6 7 DC...
Страница 5: ...ystem Behavior under Fault Conditions 41 11 2 LED Light Designation for Errors 41 12 Maintenance and Storage 43 13 Disposal of the Battery System 44 14 Technical Data 45 15 Contact Information 47 Appe...
Страница 6: ...em documentation including all safety instructions Training in dealing with the hazards associated with the installation and operation of electrical equipment and batteries Training in the installatio...
Страница 7: ...VS HVM BCP Be Connect Plus BCU Battery Control Unit BIC Battery Information Collector BMS Battery Management System BMU Battery Management Unit BYD Shenzhen BYD Electronic Co LTD SOC State of Charge S...
Страница 8: ...g changes or modifications are not allowed unless the written permission of BYD is achieved Unauthorized alterations will void the guarantee and warranty claims BYD shall not be held liable for any d...
Страница 9: ...drag or step on the battery modules Do not insert unrelated objects into any part of the battery modules Do not throw the battery module into a fire Do not soak the battery modules in water or seawate...
Страница 10: ...ages and if surge protection is missing Overvoltages e g in the event of a flash of lightning can be further conducted into the building and to other connected devices in the same network via the netw...
Страница 11: ...ture penetration can damage the BCU and impair its functionality Only open the BCU if the humidity is within the thresholds and the environment is free of sand and dust NOTICE Damage to the battery sy...
Страница 12: ...patible Inverter List Service Guideline and Checklist F Hanger wall part G Screw to fix D on BCU H Bolt to fix D and F J Screw to fix the connection between modules base and BCU x2 x2 x4 x2 D F G H Qu...
Страница 13: ...storage of excess PV energy in an inverter system A BCU B Battery Module C Base D Operating Panel E LED Button F Air Switch There are two types of battery modules HVM and HVS The HVM module has two s...
Страница 14: ...manual on how to connect up to three batteries The HVS system cannot be connected with the HVM system 4 2 Interface Be Connect 2 0 Be Connect 2 0 is an app for Android and iOS system devices You can...
Страница 15: ...d diagnose the battery system and update firmware remotely for customers It is highly recommended you to make the Internet connection available to have a better service 4 3 Symbols on the System Symbo...
Страница 16: ...cates that the system must be additionally grounded if additional grounding or equipotential bonding is required at the installation site Keep the battery modules away from children RCM Regulatory Com...
Страница 17: ...ashing white quickly The battery system is discharging Flashing white and glowing blue The battery system is discharging and the SOC is below 15 Flashing white and blue An event message has occurred r...
Страница 18: ...ion location must be inaccessible to children c The installation location must be suitable for the weight and dimensions of the battery system d The installation location must not be exposed to direct...
Страница 19: ...n dealing with the battery system 5 1 4 Additionally Required Installation Material Pen Hair Dryer Wire Stripper Phillips Screwdriver Bit Flat Head Screwdriver Torque Wrench Tape Measure Wrench Cylind...
Страница 20: ...attention to the direction of the module The blind mating connectors on the battery module and the base should be on the same side 6 Repeat the operations for other battery modules DANGER Danger to li...
Страница 21: ...er wall part where it intends to be mounted on the wall and mark the position of the drill holes Please pay attention that there may be power cables or other supply lines e g gas or water routed in th...
Страница 22: ...perating Manual 6 Electrical Connection 6 1 Overview of the Connection Area Exterior view a Gland for Ethernet cable b Gland for data cable s to connect to an inverter and another battery system c Gla...
Страница 23: ...blocks for connecting an inverter s data cable CAN or RS485 protocol G RJ 45 port for connecting an inverter s data cable CAN protocol H I RJ 45 port for connecting with other tower s CAN protocol J...
Страница 24: ...Shenzhen BYD Electronic Co LTD 6 Electrical Connection 23 HVS HVM Operating Manual 6 2 Connection Diagram 6 2 1 One Battery System INVERTER P P a c b d e Except for Kostal Piko MP plus...
Страница 25: ...V DC c Maximum Output Current 40A DC d Breaking Current 40A DC 4 The total power cable length between each battery tower and the inverter should be less than 20 meters 1 1 Parallel connection is not a...
Страница 26: ...ke off the nut of the cable gland 5 Take off the cable support sleeve inside of the cable gland 6 Get the PE inside of the cable support sleeve 7 Lead the PE through cable gland c 8 Strip the groundin...
Страница 27: ...rements The cable length and quality affect the quality of the signal Observe the following cable requirements Cable category Cat5 Cat5e or higher Plug type Metal shielded RJ45 of Cat5 Cat5e or higher...
Страница 28: ...arallel The following section and restrictions do not apply for the parallel connection with SMA Sunny Boy Storage 3 7 6 0 Please check the inverter operation manual on how to connect up to three batt...
Страница 29: ...three battery systems could be read below Cat5 Cable Length 20 m Master Cat5 Parallel connection is not applicable to SMA Sunny Boy Storage 3 7 6 0 Please check the inverter Operating Manual on how t...
Страница 30: ...ant for outdoor use Straight through wired cables Maximum cable length 20 m Procedure 1 Take off the nut of the cable gland b 2 Take the cable support sleeve inside of the cable gland 3 Take out the p...
Страница 31: ...ces in the same network via the network cables or other data cables if there is no surge protection Touching live parts and cables results in death or lethal injuries due to electric shock Ensure that...
Страница 32: ...ameter of the cable should be between 4 mm to 9 mm Follow the requirements of the inverter manufacturer Insulation stripping length 16 18 mm Maximum cable length 20 m Procedure 1 Take off the nut of t...
Страница 33: ...and tighten the nuts on gland a and b with another hand 3 Fix the Operating Panel To do this insert the screws M4x14 through the holes on them using a Phillips screwdriver PH2 and tighten it torque 2...
Страница 34: ...1 if available 2 2 2 1 Switch on the air switch between the battery and inverter if there is any 2 Open the plastic cover on the right side of the BCU 3 Push up the air switch from the Off position to...
Страница 35: ...e is no Internet available you can press Skip to skip the firmware check 4 After the firmware downloaded press the button Check WIFI Settings to connect the battery WLAN which begins with BYD and the...
Страница 36: ...urate before a full charge and discharge after the configuration CONFIGURATION BYD 069D Battery Box TIME INVERTER SYSTEM GRID Next xxxxxx 1 2 CONFIGURATION BYD 069D Battery Box Next TIME INVERTER SYST...
Страница 37: ...Commission and configure the inverter according to the inverter manufacturer s instruction If the battery information could be read correctly it means the connection between the battery system and th...
Страница 38: ...ystem The procedure to switch off the battery system is 1 switch off the inverter 2 switch off the battery 3 switch off the air switch between the battery and the inverter if there is any The correct...
Страница 39: ...e battery system could support the black start function of compatible inverters The ways to trigger that are different for different inverters Please follow the inverter manufacturer s instructions he...
Страница 40: ...1 Shut off the inverter 2 Switch off the battery system 3 Switch off the breaker between the inverter and the battery system if there is any 4 Take off the nuts on the cable glands on Operating Panel...
Страница 41: ...sting system to an SOC of around 30 Note new modules have an SOC of around 30 2 Shut off the inverter 3 Switch off the battery system 4 Switch off the breaker between the inverter and the battery syst...
Страница 42: ...sn t start at all please contact BYD local after sales service within 48 hours Otherwise the battery could be permanently damaged 11 Troubleshooting Please also see the BYD Battery Box Premium HVS HVM...
Страница 43: ...ectronic Co LTD 42 HVS HVM Operating Manual Blue LED is flashing twelve times Inverter communication failure Blue LED is flashing thirteen times Address registration failed Blue LED is flashing fourte...
Страница 44: ...C 50 C and charged regularly according to the table below with no more than 0 5 C A C rate is a measure of the rate at which a battery is discharged relative to its maximum capacity to the SOC of 30 a...
Страница 45: ...posal regulations for electronic waste and used batteries Do not dispose of the battery system with your household waste Avoid exposing the batteries to high temperatures or direct sunlight Avoid expo...
Страница 46: ...g 205 kg Battery designation IFpP 21 173 120 32S M 10 50 90 HVM 8 3 HVM 11 0 HVM 13 8 HVM 16 6 HVM 19 3 HVM 22 1 Battery Module HVM 2 76 kWh 51 2 V 38 kg Number of Modules 3 4 5 6 7 8 Usable Energy 1...
Страница 47: ...closure Protection Rating IP55 Round trip Efficiency 96 Certification VDE2510 50 IEC62619 CEC CE UN38 3 Applications ON Grid ON Grid Backup OFF Grid Warranty 3 10 Years 1 DC Usable Energy test conditi...
Страница 48: ...khurst NSW 221 www alpspower com au Europe EFT Systems GmbH service eft systems de Telephone 49 9352 8523999 44 0 2037695998 UK 34 91 060 22 67 ES 39 02 87368364 IT Address Bruchtannenstra e 28 63801...
Страница 49: ...ing to the latest Battery Box Premium HVS HVM Compatible Inverter List before the installation a 4 3 1 2 1 2 3 4 5 6 7 8 A Parallel connection is not applicable to SMA Sunny Boy Storage 3 7 6 0 Please...
Страница 50: ...B1 PVB2 BAT CAN DIG I O CAN DIG I O AC BACKUP AC GRID SMA STR5 0 10 0 SE Option a 1 2 3 4 SMA 1 3 4 2 BMS CAN DI DO 1 3 5 7 9 11 13 15 17 2 4 6 8 10 12 14 16 18 SMA Cable Length 20 m d Shield 1 2 SMA...
Страница 51: ...BYD Electronic Co LTD 50 HVS HVM Operating Manual 1 2 3 4 5 6 7 8 Battery Box e 7 8 2 1 Battery Box KOSTAL 1 6 5 4 KOSTAL PLENTICORE Cable Length 20 m 1 2 3 4 5 6 7 8 f 5 6 7 8 Battery Box KOSTAL 1 6...
Страница 52: ...ions with Inverters 51 HVS HVM Operating Manual g 5d 1 2 3 4 5 6 7 8 1 2 3 4 Battery Box KOSTAL Battery Box KOSTAL Smart Energy Meter Cable Length 20 m 6 2 1 2 3 4 5 6 7 8 1 2 6 5 Battery Box KOSTAL 5...
Страница 53: ...c Co LTD 52 HVS HVM Operating Manual 1 2 3 4 5 6 7 8 Kaco blueplanet hybrid 6 0 10 0 TL3 Kaco 8 7 3 6 Battery Box Kaco SET BMS hy switch LAN Shield 1 2 i Cable Length 20 m 1 2 3 4 5 6 7 8 j 1 2 3 4 5...
Страница 54: ...Appendix Connection Options with Inverters 53 HVS HVM Operating Manual k 4 5 1 2 Shield 1 2 GoodWe Viessmann Cable Length 20 m 1 2 3 4 5 6 7 8 l 1 2 3 4 5 6 7 8 H L 1 2 H L Battery Box Battery Box SUN...
Страница 55: ...ating Manual m H L 1 2 H L Battery Box SUNGROW SUNGROW Shield 1 2 Cable Length 20 m 1 2 3 4 5 6 7 8 n Battery Box SUNGROW COM2 Meter R 485 S Enable A2 B2 A1 B1 EN_H H L A2 A2 RSD DO COM NO RJ45 CAN NC...
Страница 56: ...NGROW COM2 Meter R 485 S Enable A2 B2 A1 B1 EN_H A2 A2 RSD DO COM NO RJ45 CAN NC EN_G NC NC L H NC L H 8 7 6 5 4 3 2 1 8 7 6 5 4 3 2 1 NC NC C R D4 8 D3 7 D2 6 D1 5 CAN H L 1 2 H L Battery Box SUNGROW...
Страница 57: ...ppendix Connection Options with Inverters Shenzhen BYD Electronic Co LTD 56 HVS HVM Operating Manual q Shield 1 2 1 2 3 4 5 6 7 8 Battery Box 5 6 8 7 D D Fronius Fronius Smart Meter Cable Length 20 m...
Страница 58: ...Shenzhen BYD Electronic Co LTD Appendix Connection Options with Inverters 57 HVS HVM Operating Manual t 1 2 3 4 5 6 7 8 1 2 CAN H CAN L Ingeteam Cable Length 20 m s...
Страница 59: ...nection Options with Inverters Shenzhen BYD Electronic Co LTD 58 HVS HVM Operating Manual v 1 2 3 4 5 6 7 8 4 5 1 2 Solis Cable Length 20 m u 1 2 Shield 1 2 CAN H CAN L Ingeteam Cable Length 20 m 1 2...
Страница 60: ...Shenzhen BYD Electronic Co LTD Appendix Connection Options with Inverters 59 HVS HVM Operating Manual w Shield 1 2 4 5 1 2 Solis Cable Length 20 m 1 2 3 4 5 6 7 8...