6 Electrical Connection
Shenzhen BYD Electronic Co., LTD
24
HVS&HVM Operating Manual
6.2.2.
Two
Battery Systems
6.2.3.
Three Battery Systems
Cable Length 20 m
≤
1 Parallel connection is
.
not applicable to SMA
Sunny Boy Storage
3.7-6.0. Please check
the inverter Operating
Manual on how to
connect up to three batteries.
2.The length of the power cables
to the combiner box should be same.
3.If the BYD combiner box is not used,
the parallel connection device
should meet the following requirements.
a) No less than IP 55 for the outdoor use.
b) Maximum Operating Voltage,1000V DC
c) Maximum Output Current,40A DC
d) Breaking Current, 40A DC.
4.The total power cable length
between each battery tower and the
inverter should be less than 20 meters.
1
1 Parallel connection is
.
not applicable to SMA
Sunny Boy Storage
3.7-6.0. Please check
the inverter Operating
Manual on how to
connect up to three batteries.
2.The length of the power cables
to the combiner box should be same.
3.If the BYD combiner box is not used,
the parallel connection device
should meet the following requirements.
a) No less than IP 55 for the outdoor use.
b) Maximum Operating Voltage,1000V DC
c) Maximum Output Current,40A DC
d) Breaking Current, 40A DC.
4.The total power cable length
between each battery tower and the
inverter should be less than 20 meters.
Cable Length 20 m
≤