![BYD B-Box H10.2 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/byd/b-box-h10-2/b-box-h10-2_installation-guidance_2836917007.webp)
B-Box HV Installation Manual
7
/
35
Definition of BCU Functional Interfaces
No.
Interface Name
Description
1
P+
The system positive terminal, connected to the positive terminal of battery interface of inverter.
2
P-
The system negative terminal, connected to the negative terminal of battery interface of inverter.
3
GND
Grounding terminal, connected to the ground.
4
Ethernet
Connected to the Ethernet, to complete the functions of communication and remote program update.
5
Inverter
communication
Contain RS485, CAN, and enable signals, outputting 13V power.
6
System switch
The main switch of system, which can be operated manually and has short circuit protection function.
Содержание B-Box H10.2
Страница 1: ...B Box HV Installation Manual 1 35 B Box H 6 4 11 5 Installation Guidance Rev 1_Aug 2017 ...
Страница 5: ...B Box HV Installation Manual 5 35 Position Designation A Base B B Plus H C BCU A C A B C ...
Страница 12: ...B Box HV Installation Manual 12 35 5 5 Personal Protection Equipment ...
Страница 20: ...B Box HV Installation Manual 20 35 P P GND Ethernet cable Communication cable P P ...
Страница 23: ...B Box HV Installation Manual 23 35 ...