background image

Live

Neutral

Earth

Filtration 

contact

NO

Slaving the exchanger 

circulation pump to the 

filtration pump.

If the circulation pump is not slaved to the filtration pump, shunt the two terminals using the shunt provided. 

When a heating demand is detected the circulation pump will start up even if the filtration pump is not 

running.

CAUTION: 

To avoid heating of the termninals, ensure that the terminal screws are well tightened.

Plug the male connecter into the female connector.

CAUTION: 

The heat exchanger seal ensures leaktightness of the heating circuit. The two nuts on the body of the heat exchanger 

should under no circumstances be loosened. Failure to comply with this instruction could lead to cancellation of 

guarantees.

Primary circuit

• 

The cross section of the primary circuit will be determined by the rate of flow into the heat exchanger 

(refer to the technical specifications of the various models).

IMPORTANT

When tightening (or loosening) the primary circuit connections on the exchanger’s brass unions, hold the unions steady 

using a wrench to prevent any movement. Any rotation of the brass unions could damage the plastic body of the heat 

exchanger and give rise to a leak, cancelling any guarantees.

  

Secondary circuit

• 

The secondary circuit is plumbed into the pool return line, preferably in by-pass, after the filter and 

before the injection of any chemical products.

• 

Make the necessary provisions to cope with the risk of freezing during winter, notably ensure that it is 

possible to drain the secondary circuit completely (by means of a drain valve mounted on the installation 

or by loosening one of the unions on the heat exchanger).

2020/11 - Indice de révision : J - Code : 33035

CHAUFFAGE ET DÉSHUMIDIFICATION

19/56

Содержание 9200200

Страница 1: ...read carefully and kept for future reference FR PAGE 1 EN PAGE 15 DE SEITE 29 ES P GINA 43 Heat exchanger ET NU25 ET NU40 ET NU60 ET NU90 ET CA25 ET CA40 ET CA60 ET CA90 2020 11 Indice de r vision J C...

Страница 2: ...NSTALLATION OF THE HEAT EXCHANGER 17 2 1 Installation site 17 2 2 Hydraulic connections 17 3 ELECTRICAL WIRING 18 4 STARTING UP THE HEAT EXCHANGER 20 5 OPERATING CONTROLS 20 6 WINTERIZING 21 7 TECHNIC...

Страница 3: ...anger should be installed as close as possible to the boiler in order to minimise heat loss If this is not possible you will need to lag the primary circuit pipes with thermal insulation For optimum h...

Страница 4: ...pool water entry point To invert the direction of water flow do the following Unscrew both of the 3 part unions on the circulator and invert them Screw the 3 part unions back together Take the tempera...

Страница 5: ...the primary circuit will be determined by the rate of flow into the heat exchanger refer to the technical specifications of the various models IMPORTANT When tightening or loosening the primary circu...

Страница 6: ...hen press SET or wait 10 seconds While the snowflake is lit up the device is running normally Once the desired set point is displayed wait for a few seconds the pool temperature will be displayed agai...

Страница 7: ...circuit lines especially if the secondary circuit runs outside between the heat exchanger and the filter Drain the heat exchanger body using the drain valve on the installation or by loosening one of...

Страница 8: ...m3 h Head loss on the secondary circuit POOL Head loss mWC Secondary circuit flow rate m3 h Head loss on the primary circuit BOILER 25 and 40 kW 60 kW 25 kW 40 kW 60 kW 90 kW 90 kW 2020 11 Indice de r...

Страница 9: ...n kW pool water at 10 C pool water at 20 C pool water at 30 C Heat exchanger BWT 40 kW Power output as a function of the boiler and pool water temperatures Temperature BOILER C Power in kW pool water...

Страница 10: ...n kW pool water at 10 C pool water at 20 C pool water at 30 C Heat exchanger BWT 90 kW Power output as a function of the boiler and pool water temperatures Temperature BOILER C Power in kW pool water...

Страница 11: ...8 FOOT PRINT OF THE HEAT EXCHANGER 25 kW and 40 kW models 60 kW and 90 kW models 176 6 176 6 30 65 30 85 30 196 1 196 1 2020 11 Indice de r vision J Code 33035 CHAUFFAGE ET D SHUMIDIFICATION 25 56...

Страница 12: ...9 FOOTPRINT OF THE PRESASSEMBLED HEAT EXCHANGER 25 kW and 40 kW models M60 kW and 90 kW models 131 7 2020 11 Indice de r vision J Code 33035 CHAUFFAGE ET D SHUMIDIFICATION 26 56...

Страница 13: ...Notes CHAUFFAGE ET D SHUMIDIFICATION 27 56...

Страница 14: ...Notes 2020 11 Indice de r vision J Code 33035 CHAUFFAGE ET D SHUMIDIFICATION 28 56...

Отзывы: