-2-
REQUIRED TOOLS
Flat blade screwdriver and pliers. A 1/4", 11/32" and 3/8" nut driver will be
helpful.
ASSEMBLY
Refer to the appropriate diagrams and proceed as follows:
1. Check to be sure that all parts are present.
2. Install tube w/insulator (A) per instructions packaged with mounting system or
Tech Notes Ground/Radial Systems.
NOTE: A small packet of anti-seize/anti-oxide compound (Butter-
It’s-Not™) will be found inside tube w/insulator (A). This
compound should be applied lightly to each tubing joint and to
the inside of all clamps that must make good electrical contact
with the tubing sections.
3. Locate tube (B) and tube (B1). Slide the insulator end of tube (B1) into the end
of tube (B) with hole located 1/4 in (6.4 mm) from the end of the tube. Pass a
# 8 x 1 1/2" screw through both parts and secure with a lock washer and hex
nut.
4. From the center of the insulator, measure downward to a point that is 13 in
(33 cm) along tube (B) and make a pencil mark.
5. From the center of the insulator, measure upward to a point that is 9 3/8"
(23.8 cm) along tube (B1) and make a pencil mark.
6. Locate coil assembly 80/40 meter (C) and slide the clamp at the outer end of
the larger 80 meter coil over tube (B1), lowering the entire assembly until the
middle clamp can be positioned around the insulator between tube (B) and
tube (B1).
NOTE: The middle clamp may have to be pulled open slightly to
pass the bolt that goes through tube (B1) and the insulator.
7. Position the center coil clamp of coil assembly 80/40
meter (C) in the center of the insulator between tube (B)
and tube (B1). Pass a #10 x 1" screw through the clamp
as shown. Secure with a flat washer, lock washer and
wing nut.
Содержание HF9V
Страница 14: ...14 Feedline Detail PICTORIAL...