OPERATION
HT210
06/17
Operation Section 4-12
OPERA
T
ION
© 2016 Alamo Group Inc.
Before each use, a complete inspection and service is required to ensure the hay tedder is in a good and safe
working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure
the hay tedder is ready for operation, conduct the following.
OPS-HT-0020
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure the manual canister is secured to the
equipment with the operator’s manual inside.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals.
OPS-U- 0011
Содержание HT210
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 23: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 25: ......
Страница 27: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 33: ...Operation Section 4 1 OPERATION SECTION...
Страница 56: ......
Страница 57: ...Maintenance Section 5 1 2016 Alamo Group Inc MAINTENANCE SECTION...
Страница 60: ...MAINTENANCE HT210 06 17 Maintenance Section 5 4 2016 Alamo Group Inc MAINTENANCE...
Страница 62: ...HT210 SOM 06 17 P N 50068746 Printed U S A HT210 HAY TEDDER...