OPERATION
3PBS1-3PBS2 10/20
Operation Section 4-9
© 2020 Alamo Group Inc.
O
PE
R
AT
IO
N
7.2 Implement Pre-Operation Inspection/Service
Before each implement use, a complete inspection and service is required to ensure the implement is in a
good and safe working condition. Damaged and/or broken parts should be repaired and/or replaced
immediately. To ensure the implement is ready for operation, conduct the following.
OPS-T-0002
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure the manual canister is secured to the
equipment with the operator’s manual inside.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals.
OPS-U- 0011
Содержание 3PBS1
Страница 4: ...Safety Section 1 1 SAFETY SECTION...
Страница 14: ...SAFETY 3PBS1 3PBS2 10 20 Safety Section 1 11 2020Alamo Group Inc...
Страница 15: ......
Страница 16: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 20: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 22: ...Operation Section 4 1 OPERATION SECTION...
Страница 41: ......
Страница 42: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 44: ......
Страница 46: ...3PBS1 3PBS2 SOM 10 20 P N 50073292 Printed U S A 3PBS1 3PBS2 BALE SPEAR...