OPERATION
3PBS1-3PBS2 10/20
Operation Section 4-11
© 2020 Alamo Group Inc.
O
PE
R
AT
IO
N
BALE SPEAR PRE-OPERATION Inspection
Sub Soiler ID#:____________________Make:__________________________
Date: ___________________________Shift:___________________________
Before conducting the inspection, make sure the tractor engine is off, all rotation
has stopped and the tractor is in park with the parking brake engaged. Make sure
the Sub Soiler is resting on the ground or securely blocked up and all hydraulic
pressure has been relieved.
Operator’s Signature:_____________________________________________________
Table 2:
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
The Operator’s Manual has been read and under
-
All Safety Decals are in place and legible.
The Hitch connection pins are properly retained.
There are no cracks in Hitch.
All bolts are in place and properly tightened.
All grease fittings and lubrication points have
Check for chips, cracked or worn parts past
DO NOT OPERATE an UNSAFE TRACTOR or IMPLEMENT
Содержание 3PBS1
Страница 4: ...Safety Section 1 1 SAFETY SECTION...
Страница 14: ...SAFETY 3PBS1 3PBS2 10 20 Safety Section 1 11 2020Alamo Group Inc...
Страница 15: ......
Страница 16: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 20: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 22: ...Operation Section 4 1 OPERATION SECTION...
Страница 41: ......
Страница 42: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 44: ......
Страница 46: ...3PBS1 3PBS2 SOM 10 20 P N 50073292 Printed U S A 3PBS1 3PBS2 BALE SPEAR...