OPERATION
2297 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
It is important to keep the bucket level when
approaching a bank or pile. This will help prevent
gouging the work area.
PEELING AND SCRAPING
Use a slight bucket angle, travel forward and hold
lift control forward to start the cut. Make a short 5 to
8 foot angle cut and break out cleanly.
With bucket level, start a cut at notch approximately
2 inches deep. Hold depth by feathering bucket
control to adjust cutting lip up or down. When front
tires enter the notch, adjust lift cylinder to maintain
proper depth.
Содержание 2297
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 43: ...Operation Section 4 1 OPERATION SECTION...
Страница 85: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 94: ...MAINTENANCE 2297 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Страница 95: ...MAINTENANCE 2297 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 98: ...2297 SOM 01 11 P N 50069201 Printed U S A 2297 LOADER...