OPERATION
2297 01/11
Operation Section 4-25
© 2011 Alamo Group Inc.
OPERA
T
ION
Lift and roll back of bucket will increase efficiency
because...
A level bucket throughout the lifting cycle resists
bucket lift and increases breakaway effort.
NOTE:
Do not be concerned if the bucket is not
completely filled during each pass. Maximum
productivity is determined by the amount of material
loaded in a given period of time. Time is lost if two
or more attempts are made to fill the bucket on
each pass.
LIFTING THE LOAD
When lifting the load, keep the bucket positioned to
avoid spillage. Tilt bucket forward while raising to
maintain bucket angle.
Содержание 2297
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 43: ...Operation Section 4 1 OPERATION SECTION...
Страница 85: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 94: ...MAINTENANCE 2297 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Страница 95: ...MAINTENANCE 2297 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 98: ...2297 SOM 01 11 P N 50069201 Printed U S A 2297 LOADER...