OPERATION
2297 01/11
Operation Section 4-14
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADER BOOM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly
installed.
•
Check condition of bushings at boom pivot
points.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
OPS-L-0005_B
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings.
IMPORTANT
: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of bushings.
OPS-L-0018_B
Hydraulic Hoses
BUCKET INSPECTION
•
Ensure all pins are in place.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
•
Inspect the condition of the bucket lug
weldments.
•
Inspect condition of bushings.
OPS-L-0007_B
Bucket Pins
Содержание 2297
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 43: ...Operation Section 4 1 OPERATION SECTION...
Страница 85: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 94: ...MAINTENANCE 2297 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Страница 95: ...MAINTENANCE 2297 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 98: ...2297 SOM 01 11 P N 50069201 Printed U S A 2297 LOADER...