Commissioning | 6
0870567093_NC0630C_ACV_A0002_IM_en
21 / 36
5.9.1 Wiring Diagram Temperature Switch
Part no.:
0651 541 566
U = 250 VAC ; I = 2.5 A
►
cos
φ
= 1
U = 250 VAC ; I = 1.6 A
►
cos
φ
= 0.6
U = 48 VDC ; I = 1.25 A
Contact :
Normally closed
Switch point:
T
trip
= 100 °C
2
1
T
1 = White ; 2 = Brown
5.9.2 Wiring Diagram Flow Switch (Optional)
Part no.:
RC15-14-N3 (ref. Fuchs)
U = 5 … 25 V ; I = 1 … 3 mA
Switching element function:
NAMUR, bistable
Contact:
Normally open
2 (-)
1 (+)
1 = Brown ; 2 = Blue
Switch point:
3 SLM
►
min. volume flow
5.9.3 Wiring Diagram Level Switch (Optional)
Part no.:
0652 556 531
Connector:
M12x1, 4-pin
< 6 mW at I < 1 mA;
< 38 mW at I = 3.5 mA
Switching element function:
NAMUR
Contact:
Normally closed
1
2
4
3
4
1
L
1 = Brown ; 4 = Black
Switch point:
L
warning
= LS1
►
pin 1 + 4
►
low level “warning”
L
trip
= LS2
►
pin 1 + 4
►
low level “stop flushing”
6
Commissioning
NOTICE
The machine is shipped without oil.
Operation without oil will ruin the machine in short time!
• Prior to commissioning, the machine must be filled with oil, see
Filling Oil [
►
14]
.
NOTICE
Lubricating a dry running machine (process chamber).
Risk of damage to the machine!
• Do not lubricate the process chamber of the machine with oil or grease.
All manuals and user guides at all-guides.com
all-guides.com