
9
III. Venting
Table 1: Vent System Options
Table : Vent System Components Included with Boiler
WARNING
Do not use this boiler with galvanized, Type 04 or Type 16 stainless steel, non metallic or any other
non AL9-4C
®
based vent systems.
Do not use a barometric damper or drafthood with this appliance.
Do not use vent dampers with this boiler.
Moisture and ice may form on surfaces around termination. To prevent deterioration, surfaces should
be in good repair (sealed, painted, etc.).
This appliance needs fresh air for safe operation and must be installed so there are provisions for
adequate combustion and ventilation air.
Read, understand and follow combustion air instruction restrictions contained in the Pre-Installation
instructions of this manual.
Do not operate appliance where gasoline or other flammable vapors or liquids, or sources of hydro
-
carbons (i.e. bleaches, cleaners, chemicals, sprays, paint removers, fabric softeners, etc.) are used,
stored and/or present in the air.
When installing vent pipe through chimney, no other appliance can be vented into the chimney.
Do not exceed maximum vent lengths. Refer to Table 4.
Option
Description
Additional
Vent Kit
Required
Installation
Drawing and
Specification
(See Section)
1. Horizontal
Power Vent (air from within building) the vent pipe terminates
horizontally (through a sidewall).
45° Elbow
D.
2. Vertical
Power Vent (air from within building) the vent pipe terminates
vertically (through the roof).
No
E.
3. Horizontal
Power Vent (air from within building) the vent pipe terminates
horizontally (snorkel through a side wall)
45° Elbow
F.
Gasketed Vent System Components
Part Number
Vent Terminal 3” -Horizontal PVG-3 thru PVG-7)
8110701
Vent Terminal 4” -Horizontal (PVG-8 & PVG 9)
8110702
Содержание PVG
Страница 6: ... Figure 2 Dimensions ...
Страница 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Страница 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Страница 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Страница 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Страница 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Страница 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Страница 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Страница 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Страница 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Страница 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Страница 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Страница 39: ...39 Figure 21 Modular Boiler Piping ...
Страница 41: ...41 Figure 22 Operating Instructions ...
Страница 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Страница 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Страница 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 56: ...56 ...
Страница 60: ...60 ...
Страница 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED ...