45
I.
Sequence of Operation.
See Figure 25. If boiler fails
to operate properly, see Troubleshooting Tree in Section
IX: Service.
J.
Check pilot burner flame.
See Figure 27. Flame
should be steady, medium hard blue enveloping 3/8 to
½ inch of sensing probe.
K.
Check main burner flame.
See Figures 26. Flame
should have clearly defined inner cone with no yellow
tipping. Orange-yellow streaks should not be confused
with true yellow tipping.
Figure 26: 1 Inch Main Burner flame
Figure 7: Pilot Burner Flame
Figure 25: Sequence of Operation
L
. Check thermostat operation.
Raise and lower
temperature setting to start and stop boiler operation.
M.
Check ignition control module shut-off.
Disconnect
pilot lead wires from gas valve. If burners do not
shutdown, determine cause of malfunction. Replace
necessary items and check operation.
N.
Check low water cutoff
(if so equipped).
1. Adjust thermostat to highest setting.
2. With boiler operating, open drain valve and slowly
drain boiler.
3. Main burners and pilot burner will extinguish and
blower will stop when water level drops below low
water cutoff probe. Verify limit, thermostat or other
controls have not shut off boiler.
4. Adjust thermostat to lowest setting. Refill boiler.
O.
Check limit.
1. Adjust thermostat to highest setting.
2. Observe temperature gauge. When temperature is
indicated, adjust limit to setting below observed
Содержание PVG
Страница 6: ... Figure 2 Dimensions ...
Страница 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Страница 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Страница 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Страница 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Страница 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Страница 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Страница 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Страница 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Страница 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Страница 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Страница 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Страница 39: ...39 Figure 21 Modular Boiler Piping ...
Страница 41: ...41 Figure 22 Operating Instructions ...
Страница 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Страница 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Страница 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 56: ...56 ...
Страница 60: ...60 ...
Страница 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED ...