![Burnham PVG Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/burnham/pvg/pvg_installation-operating-and-service-instructions_2832965013.webp)
1
c. Tighten locking band by HAND with a 5/16”
nut driver until snug plus ¼ turn. DO NOT
SECURE JOINTS WITH SHEET METAL
SCREWS OR POP RIVETS. DO NOT
PUNCTURE THE VENT SYSTEM!
d. Once the installation is complete, operate
appliance and inspect all joints to ensure that flue
gases and/or liquid condensate will not escape.
D.
Separate Horizontal Venting System.
See Figures 4A,
4B and 5. See Figure 29 on Page 48 for Blower Vent
Connector Assembly.
Vent Piping
–
1. This boiler is supplied with components as standard
equipment for installation of the separate horizontal
venting system.
2. Do not exceed maximum vent/air intake lengths.
Refer to Table 4.
3. Recommended horizontal installation consists
of vent being sloped down ¼ inch per foot away
from boiler. See Figure 4A. See Figure 4B for an
alternate horizontal installation.
4. Use appropriate designed thimbles when passing
through combustible walls (thimble use optional for
noncombustible walls). Insert thimble through wall
from outside. Secure outside flange to wall with
nails or screws, and seal ID, OD and vent holes with
sealant material. Install inside flange to inside wall,
secure with nails or screws, and seal with sealant
material.
5. For noncombustible wall application when thimble
is not used, size opening such that bell with locking
band attached cannot pass through.
6. Join vent terminal to vent pipe. See Figure 5.
7. Insert vent pipe through thimble/opening from
outside and join to vent system. Apply sealant
between vent pipe and opening/thimble to provide
weathertight seal.
Содержание PVG
Страница 6: ... Figure 2 Dimensions ...
Страница 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Страница 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Страница 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Страница 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Страница 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Страница 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Страница 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Страница 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Страница 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Страница 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Страница 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Страница 39: ...39 Figure 21 Modular Boiler Piping ...
Страница 41: ...41 Figure 22 Operating Instructions ...
Страница 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Страница 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Страница 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 56: ...56 ...
Страница 60: ...60 ...
Страница 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED ...