background image

23

1.  Clean terminal screens. Terminals must be free of 

obstruction, undamaged, with screens securely in 
place.

2.  Terminal and wall thimbles (if used) must be 

weathertight.

3.  Pipe must be full round shape, and show no damage 

from impact or excessive temperature.

4.  Pipe must be supported at minimum 5 foot intervals 

and must not sag.

5.  All vent joints must be secure and watertight.

6.  All air intake joints must be secure and airtight.  

Horizontal vent tee drain (if used) must have 
minimum 6 inch trap and allow condensate to fl ow 
freely.  To Clean:

a.  Disconnect drain tube from drain fi tting.

b.  Flush drain tube with water. Fill trap with water.

c.  Securely fasten drain tube to drain fi tting, 

providing gas-tight and watertight seal.

7.   If pipe must be disassembled for removal of 

obstructions or resealing of joint:

a.  Remove locking band (vent pipe only).

b.  Break skin of sealant with utility knife. Do not 

cut or score pipe.

c.  Pull pipe from fi tting.

d.  Clean pipe and fi tting of all cured sealant.

e.  Join pipe and fi tting as described in Section VI: 

Venting/Air Intake Piping.

E.

 

Boiler Flue Passages. 

 Inspect for blockage or soot 

accumulation.

1.  Remove Main Burners.  See Figure 25.

a.  Remove jacket front door.

b.  Remove combustion air enclosure cover.

c.  Remove Burner Access Panel by lifting up and 

out.

d.  Disconnect Ignitor/Sensor Wire from pilot 

burner.

e.  Mark location of Main Burner with Pilot Bracket 

on gas manifold.

f.  Remove External Hitch Pin Clips.

g.  Hold Main Burner on throat.  Lift slightly while 

pushing toward rear of boiler to disengage from 
Burner Tray and to clear Gas Orifi ce.  Pull Main 
Burner from combustion chamber.

2.  Remove four (4) locknuts securing vent connector.  

A.

 General.

 Inspection and service should be conducted 

annually. Turn off electrical power and gas supply while 
conducting service or maintenance. Follow instructions 
TO TURN OFF GAS TO APPLIANCE. See Figure 22.

N

O

I

T

U

A

C

n

e

h

w

n

o

i

t

c

e

n

n

o

c

s

i

d

o

t

r

o

i

r

p

s

e

r

i

w

l

l

a

l

e

b

a

L

e

s

u

a

c

n

a

c

s

r

o

r

r

e

g

n

i

r

i

W

.

s

l

o

r

t

n

o

c

g

n

i

c

i

v

r

e

s

y

f

i

r

e

V

.

n

o

i

t

a

r

e

p

o

s

u

o

r

e

g

n

a

d

d

n

a

r

e

p

o

r

p

m

i

.

g

n

i

c

i

v

r

e

s

r

e

t

f

a

n

o

i

t

a

r

e

p

o

r

e

p

o

r

p

B

.  Inspect domestic hot water coil gasket for water 

leakage.  

Tighten nuts or replace gasket if leakage is 

evident.

C

.  Low water cut-off 

(if so equipped).

1. Float Type

a.  Monthly Blowoff.  During the heating season, if 

an external fl oat type low water cut-off is on the 
boiler, the blow off valve should be opened once 
a month (use greater frequency where conditions 
warrant), to fl ush out the sediment chamber so 
the device will be free to function properly.

b.  Annual Service.  Float type low water cutoffs 

should be dismantled annually by qualifi ed 
personnel, to the extent necessary to insure 
freedom from obstructions and proper 
functioning of the working parts.  Inspect 
connecting lines to boiler for accumulation of 
mud, scale, etc., and clean as required.  Examine 
all visible wiring for brittle or worn insulation 
and make sure electrical contacts are clean and 
that they function properly.  Give special 
attention to solder joints on bellows and fl oat 
when this type of control is used.  Check fl oat for 
evidence of collapse and check mercury bulb 
(where applicable) for mercury separation or 
discoloration.

2.  Probe Type (Annual Service).  Probe type LWCO

 

should be removed once a year, examined and 
cleaned of any dirt accumulations to assure proper 
operations.  Do not attempt to repair mechanisms in 
the fi eld.  Complete replacement mechanisms, 
including necessary gaskets and installation 
instructions, are available from the manufacturer.

D.

  Vent/Air Intake System.

 Inspect for obstructions, soot 

accumulation, proper support, and deterioration of pipe, 
fi ttings, and joints.

IX. Service

Содержание Minuteman II 4-105

Страница 1: ... n i k e e s n e h W r o t c a r t n o c g n i t a e h r u o y l l a c r e l i o b o t s r i a p e r r o e c i v r e s r o F l e b a L g n i t a R n o n w o h s s a r e b m u N l a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e b m u N l e d o M r e l i o B _ _ _ _ _ _ _ I I M M r e b m u N l a i r e S r e l i o B _ _ _ _ _ _ _ 6 e t a D n o i t a l l a t s n I r o t c a r t n o...

Страница 2: ...a m d e d i o v a t o n f i h c i h w y t r e p o r p r o y r u j n i r o n i m r o e t a r e d o m e g a m a d E C I T O N n o s n o i t c u r t s n i l a i c e p s s e t a c i d n I e c n a n e t n i a m r o n o i t a r e p o n o i t a l l a t s n i o t d e t a l e r t o n t u b t n a t r o p m i e r a h c i h w s d r a z a h y r u j n i l a n o s r e p The New York City Department of Buildings ...

Страница 3: ...R I A N O I T C E N N O C S E H C N I A I D T N E V E U L F N O I T C E N N O C S E H C N I A I D Y T I C A P A C R E T A W A X O R P P A G N I P P I H S T H G I E W R E L I O B L E D O M Y L P P U S T P N N R U T E R T P N R E T A W T P N N I R E T A W T P N T U O R E L I O B S N O L L A G K N A T S N O L L A G 0 7 4 I I M M 4 1 1 4 1 1 2 1 2 1 2 1 4 3 2 1 2 6 7 1 8 7 5 B L 7 0 3 5 0 1 4 I I M M ...

Страница 4: ...nces and Equipment and CSA C22 1 Canadian Electrical Code Part I B Appliance is design certified for installation on combustible flooring The boiler must not be installed on carpeting C Provide clearance between boiler jacket and combustible material in accordance with local fire ordinance Refer to Figure 2 for minimum listed clearance from combustible material Recommended service clearance is 24 ...

Страница 5: ... t n o c III Water Piping and Trim Figure 3 Removal From Skid A Design and install boiler and system piping to prevent oxygen contamination of boiler water Oxygen contamination sources are system leaks requiring addition of makeup water fittings and oxygen permeable materials in distribution system Eliminate oxygen contamination by repairing system leaks repairing fittings and using nonpermeable m...

Страница 6: ...is used in connection with refrigeration systems boiler must be installed with chilled medium piped in parallel with the heating boiler using appropriate valves to prevent chilled medium from entering boiler see Figure 5 Also consult I B R Installation and Piping Guides Refer to Figure 5a for a diagram of the water piping system inside the Minuteman II s jacket E If boiler is connected to heating ...

Страница 7: ...w water cut off is required it must be mounted in the system piping above the boiler The minimum safe water level of a hot water boiler is just above the highest water containing cavity of the boiler that is a hot water boiler must be full of water to operate safely H Oil grease and other foreign materials which accumulate in new hot water boilers and a new or reworked system should be boiled out ...

Страница 8: ...t off cold water supply at main shutoff valve 2 Open 1 or more system faucets to relieve pressure Open system drain valve leaving faucets open to relieve vacuum 3 Disconnect exiting domestic hot water heating system if applicable C Connect hot water piping to NPT outlet of heater See Figure 7 G N I N R A W g n i r e p m e t e v l a v g n i x i m c i t a m o t u a n a l l a t s n I k s i r d i o v ...

Страница 9: ...nce with local plumbing codes and requirements of gas supplier In absence of such requirements follow National Fuel Gas Code ANSI Z223 1 2 Use thread joint compounds pipe dope resistant to action of liquefied petroleum gas 3 Install sediment trap ground joint union and manual shut off valve upstream of boiler gas control valve and outside of jacket See Figure 8 4 All above ground gas piping upstre...

Страница 10: ...s e c i f i r o s r e l i o b n a i d a n a C F x i d n e p p A d n a 2 1 8 n o i t c e S 1 3 2 2 Z I S N A e d o C s a G l e u F l a n o i t a N l e d o m e h t y b e l b a i f i t n e d i e r a s l e d o m r e l i o b e d u t i t l a h g i H l e b a l g n i t a r e h t n o d e t a c i d n i s i g n i z i s l e b a l g n i t a r e h t n o H x i f f u s r e b m u n Table 4 Fitting Equivalent Lengt...

Страница 11: ... r u g i F n i w o l e b d e r u t c i p s t n e n o p m o c m e t s y s t n e v d e t e k s a g e h T g n i t n e v s s e l t e k s a g d e i l p p u s y l s u o i v e r p e h t h t i w e l b a e g n a h c r e t n i s i t n e n o p m o c t n e v o d y e h t s a n i o j o t r e i s a e d n a r e k c i u q y l l a r e n e g e r a s t n e n o p m o c t n e v r e w e n e h T s t n e n o p m o c d e h...

Страница 12: ...or Operating Instructions Adjust thermostat so appliance will operate continuously 5 Test for spillage at the drafthood relief opening after 5 minutes of main burner operation Use the flame of a match or candle or smoke from a cigarette cigar or pipe 6 After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above retu...

Страница 13: ...sive wheel Remove male bead end only female bell end accepts next fitting or pipe E C I T O N r o d e l i f d n a e p i p h t i w e r a u q s e b t s u m t u C y l l u f e r a C g n i n i o j e r o f e b h t o o m s d e d n a s h t i w d n a h y b e p i p t u c f o s s e n d n u o r e r u s n e V T R h t i w t n i o j l a e S g n i l l a t s n i e r o f e b s e v o l g l a u n a m s i h t n i d e ...

Страница 14: ... Female Vent Joint Detail Figure 10D Burnham Gasket Less Female and Gasketed Male Vent Joint Detail a Clean joints of pipe or fittings using an alcohol pad to remove any dirt and grease b Slip a locking band over female bell end of pipe fitting c Apply a continuous inch bead of sealant around male end of joint no more than 1 8 inch from end d Align weld seams in pipes and use a slight twisting mot...

Страница 15: ...e t n i a p d e l a e s r i a p e r 2 Vent terminal location restricted per following a Minimum 12 inches above grade or normally expected snow accumulation level or 7 feet above grade if located adjacent to public walkway Do not install over public walkways or areas where local experience indicates condensate or vapor from Category III appliances creates a nuisance or hazard b Minimum 3 feet abov...

Страница 16: ...ze opening such that female bell end with locking band attached cannot pass through 5 Join vent terminal to vent pipe Locate vent terminal between 3 and 6 from wall when joined to inside vent piping See Figure 13 Figure 15 Vent Air Intake Terminal Relationship Horizontal thru wall or Vertical thru roof 6 Insert vent pipe through thimble opening from outside and join to vent system Apply sealant be...

Страница 17: ...gure 19 Vertical Air Intake Termination 6 Whenever possible install vent straight through roof Refer to Figure 17 if offset is necessary Maintain 5 inch minimum clearance to combustible materials 7 Install Vent Terminal See Figure 18 a Locate roof opening to allow vertical vent penetration Size opening to maintain 5 inch minimum clearance from combustible materials b Vertical venting requires use ...

Страница 18: ...0 hertz less than 12 amperes A separate electrical circuit must be run from the main electrical service with an over current device disconnect in the circuit A service switch is recommended and may be required by some local jurisdictions Connect circuit to black and white wires and green ground screw See Figure 20 Figure 20 Wiring Diagram may be installed with vertical venting and sidewall combust...

Страница 19: ...pen hose bib 6 Open manual fill valve Make up water line should be located directly above isolation valve in boiler supply piping 7 Allow water to overflow from bucket until discharge from hose is bubble free for 30 seconds 8 Open zone valve to the second zone to be purged then close the first Repeat this step until all zones have been purged but always have one zone open At completion open all zo...

Страница 20: ...d stop boiler operation I Check domestic hot water tank aquastat operation Raise and lower temperature setting to start and stop boiler operation Tank aquastat should be set at least D Follow Operating Instructions to place boiler in operation See Figure 22 E Sequence of Operation See Figure 21 If boiler fails to operate properly see Troubleshooting Tree on pages 26 27 F Check pilot burner flame S...

Страница 21: ... be stamped on the rating label located in the boiler s vestibule compartment Adjust gas valve pressure regulator as necessary turn adjustment screw counterclockwise to decrease manifold pressure or clockwise to increase manifold pressure If pressure cannot be attained check gas valve inlet pressure If less than minimum indicated on the boiler s rating label contact gas supplier for assistance 3 C...

Страница 22: ...dure in Section IX Service ii Remove gas orifices Drill one 1 drill size larger drill size is stamped on orifice or see Key No 4C in Section X Repair Parts iii Reinstall gas orifices and main burners Measure input rate 6 Recheck Main Burner Flame 7 Return other gas fired appliances to previous conditions of use N Review User s Information Manual and system operation with owner or operator s d n o ...

Страница 23: ...ly while conducting service or maintenance Follow instructions TO TURN OFF GAS TO APPLIANCE See Figure 22 N O I T U A C n e h w n o i t c e n n o c s i d o t r o i r p s e r i w l l a l e b a L e s u a c n a c s r o r r e g n i r i W s l o r t n o c g n i c i v r e s y f i r e V n o i t a r e p o s u o r e g n a d d n a r e p o r p m i g n i c i v r e s r e t f a n o i t a r e p o r e p o r p B In...

Страница 24: ...cation There are no parts requiring lubrication on the part of the Service Technician or the User Circulator bearings are water lubricated Combustion blower motor uses sealed bearings See Figure 9 Disconnect vent connector and vent pipe from blower outlet 3 Remove Jacket Top Panels 4 Disconnect Red and Black Silicone Tubing from Canopy Pull tubing through Blower Access panel into vestibule 5 Disco...

Страница 25: ...25 Figure 25 Burner and Flueway Cleaning ...

Страница 26: ... M c w 0 8 0 5 0 1 4 I I M M c w 0 8 0 5 0 1 5 I I M M c w 9 6 0 0 4 1 5 I I M M c w 9 6 0 r e l i o B l e d o M h t i w r e n r u B n i a M t e k c a r B t o l i P 0 6 d e t a c o L r e n r u B t o l i P s r e n r u B n i a M n e e w t e B 0 7 4 1 1 M M 5 0 1 4 1 1 M M 3 4 3 5 0 1 5 1 1 M M 0 4 1 5 1 1 M M 4 5 4 f o t n o r f m o r f d e w e i v s a t h g i r o t t f e l d e r e b m u n s r e n r...

Страница 27: ...ive gear 1 A National Institute for Occupational Safety and Health NIOSH approved respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse washing machine after use to avoid contaminating other clothes Discard use...

Страница 28: ...28 ...

Страница 29: ...29 ...

Страница 30: ...N y e K e e S E 2 t e l t u O n a F e t a l P e c i f i r O 5 5 0 4 0 1 1 7 1 6 5 0 4 0 1 1 7 1 7 5 0 4 0 1 1 7 1 8 5 0 4 0 1 1 7 1 F 2 B 2 w d e d u l c n i t e l t u O n a F t e k s a G 5 3 0 6 0 2 8 2 G 2 B 2 w d e d u l c n i g n i t n u o M r e w o l B t e k s a G 9 4 0 6 0 2 8 1 H 2 g n o L 2 2 x D I 6 1 3 g n i b u T e n o c i l i S h t g n e L y f i c e p S 6 0 0 6 1 0 9 J 2 g n o L 8 1 x ...

Страница 31: ...31 ...

Страница 32: ...32 ...

Страница 33: ... c A r e n r u B 5 4 0 4 0 1 2 6 1 5 5 0 4 0 1 2 6 1 1 E 3 l e n a P s s e c c A r e n r u B 1 1 4 0 4 0 1 2 7 1 1 1 5 0 4 0 1 2 7 1 2 E 3 t e k c a r B g n i t n u o M w h c t i w S t u O l l o R e m a l F 0 6 0 6 1 0 6 1 F 3 r e s u f f i D r i A n o i t s u b m o C 5 4 0 4 0 1 2 7 1 5 5 0 4 0 1 2 7 1 G 3 d e h c a t t a n o i t a l u s n i y l b m e s s A l e n a P t n o r F e s a B 4 4 0 4 0 8...

Страница 34: ...34 ...

Страница 35: ... 4 5 5 3 6 2 2 8 5 D 4 p i l C n i P h c t i H 4 0 6 2 2 8 5 4 0 6 2 2 8 7 E 4 g L 0 3 x D O 8 1 g n i b u T t o l i P 0 1 1 6 3 2 8 1 F 4 2 3 0 8 4 9 3 l l e w y e n o H e l b a C r o s n e S n o i t i n g I 1 2 1 6 3 2 8 1 G 4 t o l i P y l b m e s s A 3 3 3 1 A 8 4 3 Q l l e w y e n o H s a G t a N 4 0 1 6 3 2 8 1 1 4 3 1 A 8 4 3 Q l l e w y e n o H P L 7 0 1 6 3 2 8 1 A N H 4 t e k c a r B t o...

Страница 36: ... 5 d u o r h S n a F 4 0 0 4 0 1 1 7 1 D 5 l e n a P r a e R r e p p U 4 1 4 0 4 0 6 1 E 5 l e n a P r a e R r e w o L 3 1 4 0 4 0 6 1 F 5 l e n a P e d i S t h g i R 1 1 4 0 4 0 6 1 G 5 l e n a P e l u b i t s e V 7 1 4 0 4 0 6 1 H 5 l e n a P k c i K 1 1 1 0 4 0 7 1 J 5 l e n a P e d i S t f e L 2 1 4 0 4 0 6 1 K 5 l e n a P t n o r F r e w o L 1 2 0 4 0 4 0 7 1 L 5 r o o D e l b a v o m e R 1 4...

Страница 37: ...a T 1 3 0 4 0 3 0 6 1 B 6 t e k c a r B t n e m h c a t t A t e k c a J 1 1 0 4 0 4 0 7 8 C 6 g L 2 1 x 0 2 4 1 w e r c S g n i p p a T f l e S 0 0 7 0 6 8 0 8 6 1 D 6 n o i t a l u s n I t n o r F 7 6 0 4 0 0 2 7 1 E 6 l i o C r e t a W t o H c i t s e m o D 1 0 4 0 3 0 6 1 F 6 6 1 8 3 t u N x e H 3 2 4 0 6 8 0 8 0 1 G 6 t e k s a G l i o C 6 3 0 6 0 2 8 1 H 6 n o i t a l u s n I r e p p a r W k ...

Страница 38: ...d o M n o i t i n g I 8 0 1 0 6 1 0 8 1 F 7 2 9 0 2 A 9 8 1 6 L l l e w y e n o H t a t s a u q A k n a T 9 9 4 0 6 1 0 8 1 G 7 9 2 0 1 V 2 2 2 8 R l l e w y e n o H y a l e R T S P D 5 3 1 0 6 1 0 8 1 H 7 7 0 0 o c a T r o t a l u c r i C 7 0 0 6 5 0 8 1 J 7 3 0 2 0 3 5 3 o c a r b n o C e v l a V n i a r D 1 6 0 3 0 6 6 0 8 1 K 7 6 0 0 1 U 2 2 2 8 R l l e w y e n o H y a l e R T S P D U 6 9 0 0 ...

Страница 39: ...Q 0 7 4 I I M M 5 0 1 4 I I M M 5 0 1 5 I I M M 0 4 1 5 I I M M n o t r a C y r o s s e c c A t n e V 1 1 9 2 1 0 1 1 1 6 1 A 1 1 r o t c e n n o C t n e V 7 0 3 6 1 1 8 1 B 1 1 l a n i m r e T t n e V 0 1 3 6 1 1 8 1 l a n i m r e T e k a t n I r i A 2 1 2 0 4 0 1 1 8 1 ...

Страница 40: ...ance with U S Boiler Co Inc s recommendations and hydronics industry standards These warran ties will be inapplicable if the Minuteman II Boiler Water Heater is used or operated over its rated capacity is subjected to unauthorized modification or is damaged as a result of being otherwise improperly operated or serviced including but not limited to damage from any of the following operation with in...

Отзывы: