background image

13

4.  Secure vent connector with washers and locknuts. 

Do not overtighten.

D.

  Install Vent Pipe, General.

1.  Plan venting system to avoid possible contact with 

plumbing or electrical wires.  Start at vent connector. 
Work toward vent terminal.

2.  Use non-combustible ¾ inch pipe strap to support 

horizontal runs and maintain vent location and slope 
while preventing sags in pipe.  Do not restrict 
thermal expansion or movement. Maximum support 
spacing is 5 feet.  Do not penetrate any part of the 
vent system with fasteners.

3.  Provide and maintain minimum 5 inch clearance to 

combustible materials. Use double wall thimble 
(Burnham Part No. 8116115) when penetrating 
combustible wall. Other wall thimble manufacturers 
are American Metal Products, Hart & Cooley, and 
Metal Fab.

4.  Once a vent pipe manufacturer and system is chosen 

never mix and match vent systems.

5.  If a non-standard length pipe is required:

 

The use of the adjustable length pipe (P/N 
8116319U) is recommended to complete a non-
standard pipe length.  This pipe requires a minimum 
installed length of 12¾ inch and can adjust across a 
7 inch gap up to a maximum of 19¾ inch long.  
(Note for the adjustable pipe the installed length 
should be measured from the centerline of the bead 
on the male end of the fi rst pipe to the end of the 
female pipe excluding the locking band of the 
second pipe with a single gasket.)  Only in the event 
the adjustable length pipe is not suffi cient a standard 
length pipe may be cut using the procedure outlined 
below .

G

N

I

N

R

A

W

f

o

h

t

g

n

e

l

d

e

l

l

a

t

s

n

i

m

u

m

i

x

a

m

d

e

e

c

x

e

r

e

v

e

N

.

e

p

i

p

h

t

g

n

e

l

e

l

b

a

t

s

u

j

d

a

r

o

f

s

e

h

c

n

i

¾

9

1

.

e

l

b

i

s

s

o

p

s

i

e

g

a

k

a

e

l

s

a

g

e

u

l

f

f

o

k

s

i

R

 

Carefully cut pipe to length using a hacksaw with 
minimum 32 teeth per inch or circular saw with 
metal abrasive wheel.  Remove male (bead) end  
only – female (bell) end accepts next fi tting or pipe.

E

C

I

T

O

N

r

o

d

e

l

i

f

d

n

a

e

p

i

p

h

t

i

w

e

r

a

u

q

s

e

b

t

s

u

m

t

u

C

y

l

l

u

f

e

r

a

C

.

g

n

i

n

i

o

j

e

r

o

f

e

b

h

t

o

o

m

s

d

e

d

n

a

s

h

t

i

w

d

n

a

h

y

b

e

p

i

p

t

u

c

f

o

s

s

e

n

d

n

u

o

r

e

r

u

s

n

e

V

T

R

h

t

i

w

t

n

i

o

j

l

a

e

S

.

g

n

i

l

l

a

t

s

n

i

e

r

o

f

e

b

s

e

v

o

l

g

.

l

a

u

n

a

m

s

i

h

t

n

i

d

e

i

f

i

c

e

p

s

6.  Seal all Burnham Gasket-Less vent, Burnham mixed 

vent (Gasket-Less and Gasketed) and fi eld cut joints 
using Dow Corning Silastic 732 RTV, Dow Corning 
Silastic 736 RTV, GE RTV106, Polybac #500 RTV, 
Sil-bond RTV 4500 (Acetoxy) and Sil-bond RTV 
6500.  Do not use other adhesives or sealants.

E. 

 Install Vent Pipe, Burnham Gasket-Less Vent System.

1.  Procedure for Joining Burnham Gasket-Less Vent 

Pipe and Fittings.  See Figure 10A.

Figure 10A:  Burnham Gasket-Less Vent Joint 

a.  Clean joints of pipe or fi ttings using an alcohol 

pad to remove any dirt and grease.

b.  Slip a locking band over female (bell) end of 

pipe/fi tting.

c.  Apply a continuous ¼ inch bead of sealant 

around male end of joint no more than 1/8 inch 
from end.

d.  Align weld seams and use a slight twisting 

motion to FULLY insert male end into female 
end of joint. Ensure bead in male end rest against 
the end of the female pipe.  

e.  Smooth sealant around joint for a continuous 

seal.  Reapply sealant if necessary.

f.  Slip the locking band over joint and align closest 

bead in locking band with bead in male end of 
pipe.

g.  Tighten locking band by HAND with a 5/16" nut 

driver until snug plus ¼ turn.  DO NOT 
SECURE JOINTS WITH SHEET METAL 
SCREWS OR POP RIVETS.  DO NOT 
PUNCTURE THE VENT SYSTEM!

h.  Once the installation is complete, operate 

appliance and inspect all joints to ensure that fl ue 
gases and/or liquid condensate will not escape.  

F. 

 Install Vent Pipe, Burnham Gasketed Vent System.

1.  Procedure for Joining Burnham Gasketed Vent Pipe 

and Fittings.  See Figure 10B.

a.  Wipe the male end of each joint using an alcohol 

pad to remove any dirt and grease.

Содержание Minuteman II 4-105

Страница 1: ... n i k e e s n e h W r o t c a r t n o c g n i t a e h r u o y l l a c r e l i o b o t s r i a p e r r o e c i v r e s r o F l e b a L g n i t a R n o n w o h s s a r e b m u N l a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e b m u N l e d o M r e l i o B _ _ _ _ _ _ _ I I M M r e b m u N l a i r e S r e l i o B _ _ _ _ _ _ _ 6 e t a D n o i t a l l a t s n I r o t c a r t n o...

Страница 2: ...a m d e d i o v a t o n f i h c i h w y t r e p o r p r o y r u j n i r o n i m r o e t a r e d o m e g a m a d E C I T O N n o s n o i t c u r t s n i l a i c e p s s e t a c i d n I e c n a n e t n i a m r o n o i t a r e p o n o i t a l l a t s n i o t d e t a l e r t o n t u b t n a t r o p m i e r a h c i h w s d r a z a h y r u j n i l a n o s r e p The New York City Department of Buildings ...

Страница 3: ...R I A N O I T C E N N O C S E H C N I A I D T N E V E U L F N O I T C E N N O C S E H C N I A I D Y T I C A P A C R E T A W A X O R P P A G N I P P I H S T H G I E W R E L I O B L E D O M Y L P P U S T P N N R U T E R T P N R E T A W T P N N I R E T A W T P N T U O R E L I O B S N O L L A G K N A T S N O L L A G 0 7 4 I I M M 4 1 1 4 1 1 2 1 2 1 2 1 4 3 2 1 2 6 7 1 8 7 5 B L 7 0 3 5 0 1 4 I I M M ...

Страница 4: ...nces and Equipment and CSA C22 1 Canadian Electrical Code Part I B Appliance is design certified for installation on combustible flooring The boiler must not be installed on carpeting C Provide clearance between boiler jacket and combustible material in accordance with local fire ordinance Refer to Figure 2 for minimum listed clearance from combustible material Recommended service clearance is 24 ...

Страница 5: ... t n o c III Water Piping and Trim Figure 3 Removal From Skid A Design and install boiler and system piping to prevent oxygen contamination of boiler water Oxygen contamination sources are system leaks requiring addition of makeup water fittings and oxygen permeable materials in distribution system Eliminate oxygen contamination by repairing system leaks repairing fittings and using nonpermeable m...

Страница 6: ...is used in connection with refrigeration systems boiler must be installed with chilled medium piped in parallel with the heating boiler using appropriate valves to prevent chilled medium from entering boiler see Figure 5 Also consult I B R Installation and Piping Guides Refer to Figure 5a for a diagram of the water piping system inside the Minuteman II s jacket E If boiler is connected to heating ...

Страница 7: ...w water cut off is required it must be mounted in the system piping above the boiler The minimum safe water level of a hot water boiler is just above the highest water containing cavity of the boiler that is a hot water boiler must be full of water to operate safely H Oil grease and other foreign materials which accumulate in new hot water boilers and a new or reworked system should be boiled out ...

Страница 8: ...t off cold water supply at main shutoff valve 2 Open 1 or more system faucets to relieve pressure Open system drain valve leaving faucets open to relieve vacuum 3 Disconnect exiting domestic hot water heating system if applicable C Connect hot water piping to NPT outlet of heater See Figure 7 G N I N R A W g n i r e p m e t e v l a v g n i x i m c i t a m o t u a n a l l a t s n I k s i r d i o v ...

Страница 9: ...nce with local plumbing codes and requirements of gas supplier In absence of such requirements follow National Fuel Gas Code ANSI Z223 1 2 Use thread joint compounds pipe dope resistant to action of liquefied petroleum gas 3 Install sediment trap ground joint union and manual shut off valve upstream of boiler gas control valve and outside of jacket See Figure 8 4 All above ground gas piping upstre...

Страница 10: ...s e c i f i r o s r e l i o b n a i d a n a C F x i d n e p p A d n a 2 1 8 n o i t c e S 1 3 2 2 Z I S N A e d o C s a G l e u F l a n o i t a N l e d o m e h t y b e l b a i f i t n e d i e r a s l e d o m r e l i o b e d u t i t l a h g i H l e b a l g n i t a r e h t n o d e t a c i d n i s i g n i z i s l e b a l g n i t a r e h t n o H x i f f u s r e b m u n Table 4 Fitting Equivalent Lengt...

Страница 11: ... r u g i F n i w o l e b d e r u t c i p s t n e n o p m o c m e t s y s t n e v d e t e k s a g e h T g n i t n e v s s e l t e k s a g d e i l p p u s y l s u o i v e r p e h t h t i w e l b a e g n a h c r e t n i s i t n e n o p m o c t n e v o d y e h t s a n i o j o t r e i s a e d n a r e k c i u q y l l a r e n e g e r a s t n e n o p m o c t n e v r e w e n e h T s t n e n o p m o c d e h...

Страница 12: ...or Operating Instructions Adjust thermostat so appliance will operate continuously 5 Test for spillage at the drafthood relief opening after 5 minutes of main burner operation Use the flame of a match or candle or smoke from a cigarette cigar or pipe 6 After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above retu...

Страница 13: ...sive wheel Remove male bead end only female bell end accepts next fitting or pipe E C I T O N r o d e l i f d n a e p i p h t i w e r a u q s e b t s u m t u C y l l u f e r a C g n i n i o j e r o f e b h t o o m s d e d n a s h t i w d n a h y b e p i p t u c f o s s e n d n u o r e r u s n e V T R h t i w t n i o j l a e S g n i l l a t s n i e r o f e b s e v o l g l a u n a m s i h t n i d e ...

Страница 14: ... Female Vent Joint Detail Figure 10D Burnham Gasket Less Female and Gasketed Male Vent Joint Detail a Clean joints of pipe or fittings using an alcohol pad to remove any dirt and grease b Slip a locking band over female bell end of pipe fitting c Apply a continuous inch bead of sealant around male end of joint no more than 1 8 inch from end d Align weld seams in pipes and use a slight twisting mot...

Страница 15: ...e t n i a p d e l a e s r i a p e r 2 Vent terminal location restricted per following a Minimum 12 inches above grade or normally expected snow accumulation level or 7 feet above grade if located adjacent to public walkway Do not install over public walkways or areas where local experience indicates condensate or vapor from Category III appliances creates a nuisance or hazard b Minimum 3 feet abov...

Страница 16: ...ze opening such that female bell end with locking band attached cannot pass through 5 Join vent terminal to vent pipe Locate vent terminal between 3 and 6 from wall when joined to inside vent piping See Figure 13 Figure 15 Vent Air Intake Terminal Relationship Horizontal thru wall or Vertical thru roof 6 Insert vent pipe through thimble opening from outside and join to vent system Apply sealant be...

Страница 17: ...gure 19 Vertical Air Intake Termination 6 Whenever possible install vent straight through roof Refer to Figure 17 if offset is necessary Maintain 5 inch minimum clearance to combustible materials 7 Install Vent Terminal See Figure 18 a Locate roof opening to allow vertical vent penetration Size opening to maintain 5 inch minimum clearance from combustible materials b Vertical venting requires use ...

Страница 18: ...0 hertz less than 12 amperes A separate electrical circuit must be run from the main electrical service with an over current device disconnect in the circuit A service switch is recommended and may be required by some local jurisdictions Connect circuit to black and white wires and green ground screw See Figure 20 Figure 20 Wiring Diagram may be installed with vertical venting and sidewall combust...

Страница 19: ...pen hose bib 6 Open manual fill valve Make up water line should be located directly above isolation valve in boiler supply piping 7 Allow water to overflow from bucket until discharge from hose is bubble free for 30 seconds 8 Open zone valve to the second zone to be purged then close the first Repeat this step until all zones have been purged but always have one zone open At completion open all zo...

Страница 20: ...d stop boiler operation I Check domestic hot water tank aquastat operation Raise and lower temperature setting to start and stop boiler operation Tank aquastat should be set at least D Follow Operating Instructions to place boiler in operation See Figure 22 E Sequence of Operation See Figure 21 If boiler fails to operate properly see Troubleshooting Tree on pages 26 27 F Check pilot burner flame S...

Страница 21: ... be stamped on the rating label located in the boiler s vestibule compartment Adjust gas valve pressure regulator as necessary turn adjustment screw counterclockwise to decrease manifold pressure or clockwise to increase manifold pressure If pressure cannot be attained check gas valve inlet pressure If less than minimum indicated on the boiler s rating label contact gas supplier for assistance 3 C...

Страница 22: ...dure in Section IX Service ii Remove gas orifices Drill one 1 drill size larger drill size is stamped on orifice or see Key No 4C in Section X Repair Parts iii Reinstall gas orifices and main burners Measure input rate 6 Recheck Main Burner Flame 7 Return other gas fired appliances to previous conditions of use N Review User s Information Manual and system operation with owner or operator s d n o ...

Страница 23: ...ly while conducting service or maintenance Follow instructions TO TURN OFF GAS TO APPLIANCE See Figure 22 N O I T U A C n e h w n o i t c e n n o c s i d o t r o i r p s e r i w l l a l e b a L e s u a c n a c s r o r r e g n i r i W s l o r t n o c g n i c i v r e s y f i r e V n o i t a r e p o s u o r e g n a d d n a r e p o r p m i g n i c i v r e s r e t f a n o i t a r e p o r e p o r p B In...

Страница 24: ...cation There are no parts requiring lubrication on the part of the Service Technician or the User Circulator bearings are water lubricated Combustion blower motor uses sealed bearings See Figure 9 Disconnect vent connector and vent pipe from blower outlet 3 Remove Jacket Top Panels 4 Disconnect Red and Black Silicone Tubing from Canopy Pull tubing through Blower Access panel into vestibule 5 Disco...

Страница 25: ...25 Figure 25 Burner and Flueway Cleaning ...

Страница 26: ... M c w 0 8 0 5 0 1 4 I I M M c w 0 8 0 5 0 1 5 I I M M c w 9 6 0 0 4 1 5 I I M M c w 9 6 0 r e l i o B l e d o M h t i w r e n r u B n i a M t e k c a r B t o l i P 0 6 d e t a c o L r e n r u B t o l i P s r e n r u B n i a M n e e w t e B 0 7 4 1 1 M M 5 0 1 4 1 1 M M 3 4 3 5 0 1 5 1 1 M M 0 4 1 5 1 1 M M 4 5 4 f o t n o r f m o r f d e w e i v s a t h g i r o t t f e l d e r e b m u n s r e n r...

Страница 27: ...ive gear 1 A National Institute for Occupational Safety and Health NIOSH approved respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse washing machine after use to avoid contaminating other clothes Discard use...

Страница 28: ...28 ...

Страница 29: ...29 ...

Страница 30: ...N y e K e e S E 2 t e l t u O n a F e t a l P e c i f i r O 5 5 0 4 0 1 1 7 1 6 5 0 4 0 1 1 7 1 7 5 0 4 0 1 1 7 1 8 5 0 4 0 1 1 7 1 F 2 B 2 w d e d u l c n i t e l t u O n a F t e k s a G 5 3 0 6 0 2 8 2 G 2 B 2 w d e d u l c n i g n i t n u o M r e w o l B t e k s a G 9 4 0 6 0 2 8 1 H 2 g n o L 2 2 x D I 6 1 3 g n i b u T e n o c i l i S h t g n e L y f i c e p S 6 0 0 6 1 0 9 J 2 g n o L 8 1 x ...

Страница 31: ...31 ...

Страница 32: ...32 ...

Страница 33: ... c A r e n r u B 5 4 0 4 0 1 2 6 1 5 5 0 4 0 1 2 6 1 1 E 3 l e n a P s s e c c A r e n r u B 1 1 4 0 4 0 1 2 7 1 1 1 5 0 4 0 1 2 7 1 2 E 3 t e k c a r B g n i t n u o M w h c t i w S t u O l l o R e m a l F 0 6 0 6 1 0 6 1 F 3 r e s u f f i D r i A n o i t s u b m o C 5 4 0 4 0 1 2 7 1 5 5 0 4 0 1 2 7 1 G 3 d e h c a t t a n o i t a l u s n i y l b m e s s A l e n a P t n o r F e s a B 4 4 0 4 0 8...

Страница 34: ...34 ...

Страница 35: ... 4 5 5 3 6 2 2 8 5 D 4 p i l C n i P h c t i H 4 0 6 2 2 8 5 4 0 6 2 2 8 7 E 4 g L 0 3 x D O 8 1 g n i b u T t o l i P 0 1 1 6 3 2 8 1 F 4 2 3 0 8 4 9 3 l l e w y e n o H e l b a C r o s n e S n o i t i n g I 1 2 1 6 3 2 8 1 G 4 t o l i P y l b m e s s A 3 3 3 1 A 8 4 3 Q l l e w y e n o H s a G t a N 4 0 1 6 3 2 8 1 1 4 3 1 A 8 4 3 Q l l e w y e n o H P L 7 0 1 6 3 2 8 1 A N H 4 t e k c a r B t o...

Страница 36: ... 5 d u o r h S n a F 4 0 0 4 0 1 1 7 1 D 5 l e n a P r a e R r e p p U 4 1 4 0 4 0 6 1 E 5 l e n a P r a e R r e w o L 3 1 4 0 4 0 6 1 F 5 l e n a P e d i S t h g i R 1 1 4 0 4 0 6 1 G 5 l e n a P e l u b i t s e V 7 1 4 0 4 0 6 1 H 5 l e n a P k c i K 1 1 1 0 4 0 7 1 J 5 l e n a P e d i S t f e L 2 1 4 0 4 0 6 1 K 5 l e n a P t n o r F r e w o L 1 2 0 4 0 4 0 7 1 L 5 r o o D e l b a v o m e R 1 4...

Страница 37: ...a T 1 3 0 4 0 3 0 6 1 B 6 t e k c a r B t n e m h c a t t A t e k c a J 1 1 0 4 0 4 0 7 8 C 6 g L 2 1 x 0 2 4 1 w e r c S g n i p p a T f l e S 0 0 7 0 6 8 0 8 6 1 D 6 n o i t a l u s n I t n o r F 7 6 0 4 0 0 2 7 1 E 6 l i o C r e t a W t o H c i t s e m o D 1 0 4 0 3 0 6 1 F 6 6 1 8 3 t u N x e H 3 2 4 0 6 8 0 8 0 1 G 6 t e k s a G l i o C 6 3 0 6 0 2 8 1 H 6 n o i t a l u s n I r e p p a r W k ...

Страница 38: ...d o M n o i t i n g I 8 0 1 0 6 1 0 8 1 F 7 2 9 0 2 A 9 8 1 6 L l l e w y e n o H t a t s a u q A k n a T 9 9 4 0 6 1 0 8 1 G 7 9 2 0 1 V 2 2 2 8 R l l e w y e n o H y a l e R T S P D 5 3 1 0 6 1 0 8 1 H 7 7 0 0 o c a T r o t a l u c r i C 7 0 0 6 5 0 8 1 J 7 3 0 2 0 3 5 3 o c a r b n o C e v l a V n i a r D 1 6 0 3 0 6 6 0 8 1 K 7 6 0 0 1 U 2 2 2 8 R l l e w y e n o H y a l e R T S P D U 6 9 0 0 ...

Страница 39: ...Q 0 7 4 I I M M 5 0 1 4 I I M M 5 0 1 5 I I M M 0 4 1 5 I I M M n o t r a C y r o s s e c c A t n e V 1 1 9 2 1 0 1 1 1 6 1 A 1 1 r o t c e n n o C t n e V 7 0 3 6 1 1 8 1 B 1 1 l a n i m r e T t n e V 0 1 3 6 1 1 8 1 l a n i m r e T e k a t n I r i A 2 1 2 0 4 0 1 1 8 1 ...

Страница 40: ...ance with U S Boiler Co Inc s recommendations and hydronics industry standards These warran ties will be inapplicable if the Minuteman II Boiler Water Heater is used or operated over its rated capacity is subjected to unauthorized modification or is damaged as a result of being otherwise improperly operated or serviced including but not limited to damage from any of the following operation with in...

Отзывы: