59
Table 10: Input Rate
L.
Adjust gas input rate to boiler.
LP/Propane.
1. Set thermostat to highest setting.
2. Adjust tank regulator for gas valve inlet pressure of
13.5 inches w.c. or less.
3. Gas valve has step opening regulator which initially
opens to 1.4 or 2.5 inch w.c. and steps to full
pressure after approximately 30 seconds. Check
manifold pressure after step has occurred. Adjust gas
valve pressure regulator as necessary for 10.0 inches
w.c. (turn adjustment screw counterclockwise to
decrease manifold pressure, or clockwise to increase
manifold pressure). If 10.0 inches w.c. can not be
attained, check gas valve inlet pressure. If less than
11.0 inches w.c., contact gas supplier for assistance.
M.
Clean Heating System (Steam).
A local qualified
water treatment chemical specialist is a suggested
source for recommendations regarding appropriate
chemical compounds and concentrations which are
compatible with local environmental regulations.
1. Oil from new piping connections and sediment in
existing piping must be removed from system to
prevent unsteady water line and carry-over of
entrained water into supply main.
a. Fill boiler to normal waterline.
b. Follow Lighting or Operating Instructions to
place boiler in operation. See Figure 48, 49, 50,
or 51.
c. Operate boiler with steam in entire system for
several days to bring system oil and dirt back to
boiler.
d. Drain condensate from drain valve in wet return.
Operate boiler until condensate runs clean.
2. Boil-out boiler.
a. Follow instructions TO TURN OFF GAS TO
APPLIANCE. See Figure 48, 49, 50, or 51.
b. Fill boiler to normal waterline.
c. Remove safety valve.
d. Pour recommended boil-out compound into
boiler through safety valve opening.
e. Reinstall safety valve in Tapping "E" with
spindle in vertical position. See Figures 1 and 2.
f. Follow Lighting or Operating Instructions to
place boiler in operation. See Figure 48, 49, 50,
or 51.
Check controls operation per Paragraphs F to J.
Boil water for at least 5 hours.
g. Follow instructions TO TURN OFF GAS TO
APPLIANCE. See Figure 48, 49, 50, or 51.
Drain boiler and system piping.
h. Remove drain valve. Thoroughly wash boiler
water passages with high pressure spray through
drain valve tapping.
i. Reinstall drain valve in Tapping "F". See
Figures 1 and 2.
3. Second Boil-out for Stubborn Cases. If all oil and
grease is not removed a second boilout using surface
blow-off is necessary.
a. Run 1 NPT pipe from Surface Blow-Off Tapping
"L" to open drain. Do not install shut-off valve or
other restriction. See Figure 2.
b. Fill boiler to top of gauge glass.
c. Remove safety valve.
d. Pour recommended boil-out compound into
boiler through safety valve opening.
e. Reinstall safety valve in Tapping "E" with
spindle in vertical position. See Figures 1 and 2.
f. Follow Lighting or Operating Instructions to
place boiler in operation. See Figure 48, 49, 50,
or 51. Boil water for approximately 5 hours
without producing steam.
g. Open boiler fill shut-off valve to produce steady
trickle of water from surface blow-off pipe.
Continue boil-out for several hours until surface
blow-off water runs clear.
Seconds
for One
Revolution
Size of Gas Meter Dial
One-Half
Cu. Ft.
One
Cu. Ft.
Two
Cu. Ft.
Five
Cu. Ft.
30
60
120
240
600
32
56
113
225
563
34
53
106
212
529
36
50
100
200
500
38
47
95
189
474
40
45
90
180
450
42
43
86
172
430
44
41
82
164
410
46
39
78
157
391
48
37
75
150
375
50
36
72
144
360
52
35
69
138
346
54
33
67
133
333
56
32
64
129
321
58
31
62
124
310
60
30
60
120
300
62
29
58
116
290
64
29
56
112
281
66
29
54
109
273
68
28
53
106
265
70
26
51
103
257
72
25
50
100
250
74
24
48
97
243
76
24
47
95
237
78
23
46
92
231
80
22
45
90
225
Содержание INDEPENDENCE IN10 CANADA
Страница 4: ... Figure 1 Dimensional Drawing ...
Страница 18: ...18 Figure 25 Recommended Water Piping for Circulator Zoned Heating System ...
Страница 19: ...19 Figure 25A Recommended Water Piping for Zone Valve Zoned Heating System ...
Страница 28: ...28 Figure 34 Vent Damper Schematic Wiring Diagram Figure 33 Vent Damper Harness to Limit ...
Страница 29: ...29 THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 30: ...30 Figure 35 Wiring Diagrams Steam Continuous Ignition Standing Pilot Probe Low Water Cutoff ...
Страница 32: ...32 Figure 36 Wiring Diagrams Steam Intermittent Ignition EI Probe Low Water Cutoff ...
Страница 34: ...34 Figure 37 Wiring Diagrams Steam Continuous Ignition Standing Pilot Float Low Water Cutoff ...
Страница 36: ...36 Figure 38 Wiring Diagrams Steam Intermittent Ignition EI Float Low Water Cutoff ...
Страница 38: ...38 Figure 39 Wiring Diagrams Water Continuous Ignition Standing Pilot Intermittent Circulation ...
Страница 40: ...40 Figure 40 Wiring Diagrams Water Intermittent Ignition EI Intermittent Circulation ...
Страница 42: ...42 Figure 41 Wiring Diagrams Water Continuous Ignition Standing Pilot Gravity Circulation ...
Страница 44: ...44 Figure 42 Wiring Diagrams Water Intermittent Ignition EI Gravity Circulation ...
Страница 46: ...46 Figure 43 Wiring Diagrams Water Continuous Ignition Standing Pilot Tankless Heater ...
Страница 48: ...48 Figure 44 Wiring Diagrams Water Intermittent Ignition EI Tankless Heater ...
Страница 51: ...51 Figure 48 Lighting Instructions Continuous Ignition System VR8200 and VR8300 Gas Valves ...
Страница 52: ...52 Figure 49 Lighting Instructions Continuous Ignition System 7000 ERHC Gas Valve ...
Страница 53: ...53 Figure 50 Operating Instruction Intermittent Ignition System VR8204 and VR8304 except IN12 Gas Valves ...
Страница 54: ...54 Figure 51 Operating Instructions Intermittent Ignition System EI VR8304 IN12 only Gas Valves ...
Страница 66: ...66 Honeywell Electronic Ignition Trouble Shooting Guide ...
Страница 67: ...67 Honeywell Hot Surface to Pilot Trouble Shooting Guide ...
Страница 80: ...80 ...
Страница 84: ...84 ...
Страница 87: ...87 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 88: ...88 ...