4
N.
Water Boiler with Continuous Ignition (Standing Pilot)
and Gravity Circulation. See Figure 41.
1. Normal Operation
a. Thermostat calls for heat. Thermostat Isolation
Relay is energized, closing contacts.
b. Vent Damper (if used) opens as stated in Vent
Damper Sequence of Operation.
c
.
Gas Valve(s) is energized allowing main gas flow
and ignition of Main Burners.
d
.
After Thermostat is satisfied Gas Valve(s) is de-
energized, extinguishing main flame. Vent
Damper (if used) closes.
2. Safety Shutdown
a
.
Limit: Automatically interrupts main burner
operation when water temperature exceeds set
point. Maximum allowable temperature is 250°F.
Normal operation resumes when water
temperature falls below set point.
b
.
Blocked Vent Switch. Automatically interrupts
main burner operation when excessive vent
system blockage occurs. Control is a multiple
use device. If blocked vent switch is activated do
not attempt to place boiler in operation. Correct
source of blockage and reset blocked vent
switch.
c
.
Flame Roll-out Switch. Automatically interrupts
boiler operation when flames or excessive heat
are present in vestibule. Control is single use
device. If flame roll-out switch is activated do
not attempt to place boiler in operation. Correct
source of blockage and replace flame roll-out
switch.
d
.
Thermocouple: senses pilot flame and causes gas
valve to turn off main burner and pilot burner gas
flow should pilot burner flame extinguish.
Содержание INDEPENDENCE IN10 CANADA
Страница 4: ... Figure 1 Dimensional Drawing ...
Страница 18: ...18 Figure 25 Recommended Water Piping for Circulator Zoned Heating System ...
Страница 19: ...19 Figure 25A Recommended Water Piping for Zone Valve Zoned Heating System ...
Страница 28: ...28 Figure 34 Vent Damper Schematic Wiring Diagram Figure 33 Vent Damper Harness to Limit ...
Страница 29: ...29 THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 30: ...30 Figure 35 Wiring Diagrams Steam Continuous Ignition Standing Pilot Probe Low Water Cutoff ...
Страница 32: ...32 Figure 36 Wiring Diagrams Steam Intermittent Ignition EI Probe Low Water Cutoff ...
Страница 34: ...34 Figure 37 Wiring Diagrams Steam Continuous Ignition Standing Pilot Float Low Water Cutoff ...
Страница 36: ...36 Figure 38 Wiring Diagrams Steam Intermittent Ignition EI Float Low Water Cutoff ...
Страница 38: ...38 Figure 39 Wiring Diagrams Water Continuous Ignition Standing Pilot Intermittent Circulation ...
Страница 40: ...40 Figure 40 Wiring Diagrams Water Intermittent Ignition EI Intermittent Circulation ...
Страница 42: ...42 Figure 41 Wiring Diagrams Water Continuous Ignition Standing Pilot Gravity Circulation ...
Страница 44: ...44 Figure 42 Wiring Diagrams Water Intermittent Ignition EI Gravity Circulation ...
Страница 46: ...46 Figure 43 Wiring Diagrams Water Continuous Ignition Standing Pilot Tankless Heater ...
Страница 48: ...48 Figure 44 Wiring Diagrams Water Intermittent Ignition EI Tankless Heater ...
Страница 51: ...51 Figure 48 Lighting Instructions Continuous Ignition System VR8200 and VR8300 Gas Valves ...
Страница 52: ...52 Figure 49 Lighting Instructions Continuous Ignition System 7000 ERHC Gas Valve ...
Страница 53: ...53 Figure 50 Operating Instruction Intermittent Ignition System VR8204 and VR8304 except IN12 Gas Valves ...
Страница 54: ...54 Figure 51 Operating Instructions Intermittent Ignition System EI VR8304 IN12 only Gas Valves ...
Страница 66: ...66 Honeywell Electronic Ignition Trouble Shooting Guide ...
Страница 67: ...67 Honeywell Hot Surface to Pilot Trouble Shooting Guide ...
Страница 80: ...80 ...
Страница 84: ...84 ...
Страница 87: ...87 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 88: ...88 ...