background image

 

  

  

 

 

 

 

 

 

  EN_Montageanleitung Wertschutzschraenke Royal  2018-09-04 NM.DOCX 

ASSEMBLY INSTRUCTIONS

 

Installation and maintenance 

 

BURG-WÄCHTER DEPOSITORY SAFE   Royal E 512-558, 

 

 

According to the certification directive, a depository safes with a weight less than 

1,000 KG must be secured with at least with one anchorage. Please also consult 

your property insurer on this matter

 

 

Important note:

 

Every depository safe is prepared for at least one anchorage as standard. Please use 

only

 the respective position intended. Before 

use, the depository safe must be bolted in order to, with a fixed connection, achieve a prevention against removal and for several 

models, to avoid the potential risk of tipping when the door is opened. We recommended using all anchoring points available on 

your safe. 

 

Please proceed as follows: 

 

  For pre-installed anchorage at the floor or rear wall, you have to drill through the outer casing of the depository safe from the 

inside at the specified points using a Ø 14 mm steel drill. 

 

Caution:

 if holes are drilled through the rear wall on depository safes, this 

must

 be fixed to the wall. 

 

 

  Move the safe to the final position.

 

 

 

  Using a Ø 14 mm masonry drill, drill into the wall and / or floor through the present 

anchoring holes. In doing so, observe the 

present maximum floor thickness and if there are any heater pipes or  

power cables, etc. installed in the floor or wall. 

 

  Remove the safe from the wall again and drill out the 

hole accordingly to Ø 16 mm. Clean the hole drilled and only then insert the dowel 

(Fischer M12S

 

or similar quality) into the hole. 

 

 

CAUTION:

  

 

Please note that depending on the type of floor or wall, special dowels may, under certain 

circumstances, increase the effect of the anchoring even more. 

 

CAUTION:

  

The gripping length of the dowel must be in the solid brickwork or concrete.  

In case of floating screed as underground, we recommend increasing the depth of the 

borehole by the thickness of this floating screed and the insulation located underneath it.  

For this case, use a bolt with respective length from professional trade with M12 thread and 

a minimum strength of 12.9 in combination with the Ø14 x Ø 58 x 6 mm washers supplied. 

 

  Put the safe back into the final position and bolt on the depository safe. 

 

 

Important note:

 

After burglary or attempted burglary and fire as well as inappropriate modifications to the design and function, the 

depository safe loses its certification which is specified on the inner door side. In such a case please contact your 

Burg-Wächter Service Partner. 

Maintenance: 

Depository safes of this series do not require any regular maintenance. If a fault should occur after a longer period of 

use, please contact your Burg-Wächter service partner. 

 

The factory guarantee for the safe is rendered invalid in event of "self-help". Please do not attempt to repair 

the safe by yourself without having consulted your Burg-Wächter Service Partner! 

The hotline call number and other information at:    www.burg.biz 

 

BURG-WÄCHTER DEPOSITORY SAFE 

 

Security for your valuables!  

 

Screw 

Washer 

 

Отзывы: