background image

 

                                                                                       Page 7  

 

 
 
 

The decarbonising machine will start the programmed cleaning cycle until 

completing the cycle. 

 

*The only way to start a new cleaning cycle, after the last cycle, is turning off the machine 
(switches position 0). 

 

 

 

PRESSURE SWITCH 

 

AT  THE  BEGINNING  OF  EVERY  CLEANING  PROCESS  IT  IS 
INDISPENSABLE  THAT  THE  USER  HAS  UNDER  CONTROL  THE 
PRESSURE GAUGE.  

 
This machine is equipped with an automatic pressure switch. 
They are factory calibrated: between

 

6 - 8 PSI

 

 
These  pressure  gauges,  even  being  made  with  membranes  and  specific 
materials  for  our  use,  it  may  happen  that  they  misplace  during  the  first 
cleanings due to temperature variations (expansion and contraction). 
 
Therefore,  they  have  been  located  in  a  visible  and  accessible  place,  so  they 
can be readjusted if necessary. 
 
Access to the pressure switch: in the back side of the machine. 
 
When should be the  working pressure re-
adjusted: 
 
When  the  machine  stops  before  the 
manometer displays: 4-6 Psi  
 
This adjustment may be necessary during 
the  first  cleanings  (hours  or  days), 
depending  on  many  factors  that  not 
necessarily have always to happen.  
 
If  the  pressure  exceeds  the  established  limits,  LEDs  will  turn  flashing  blue,  a 
bip will also sound. The machine without electronic does not have LED lights, 
so in that models only a bip will sound.  

 

Содержание 2300 LPH

Страница 1: ...Mobile station for your garage Decarbonise Decontaminate Regenerate 4600 2300 LPH MODEL ORTHO OXYHYDROGEN All the power of TECHNOLOGY at your service Econovedades...

Страница 2: ......

Страница 3: ...Page 1 4600 LPH COMPACT PRO MODEL 2300 LPH COMPACT PRO MODEL...

Страница 4: ...ANT INJURING SERIOUSLY THE MACHINE AT THE BEGINNING OF EVERY CLEANING PROCESS IT IS ESSENTIAL THAT THE USER HAS UNDER CONTROL THE PRESSURE MANOMETER THE MACHINE SHOULD BE IMMEDIATELY SHUT DOWN WITH TH...

Страница 5: ...START UP THE ENGINE WITHOUT PROCEEDING AS FOLLOWS A OPEN AND REMOVE THE AIR FILTERS AND ANY EASILY REMOVABLE TUBE SO THE GAS CAN EVACUATE OVER THE PIPELINES B BLOW COMPRESSED AIR INTO THE ENGINE PIPEL...

Страница 6: ...ct the automatic Jack plug starter to the machine back side and place the box above the engine 2 Place the start sensor above the engine where a excessive temperatura will not be registered for exampl...

Страница 7: ...DAMAGE ELECTRONIC PARTS OF THE MACHINE FIRMLY CLOSE THE CAP The gas is very volatile so if it is not properly closed it will scape It will be necessary to add water each time that the machine level s...

Страница 8: ...ACHINE ON WITH THE REMOTE CONTROL A CONTROL IS INCORPORATED THAT ALLOWS YOU TURN THE MACHINE ON MANUALLY EMERGENCY METHOD IN CASE THAT FOR ANY REASON THE MACHINE DOES NOT START WITH THE AUTOMATIC SENS...

Страница 9: ...e it may happen that they misplace during the first cleanings due to temperature variations expansion and contraction Therefore they have been located in a visible and accessible place so they can be...

Страница 10: ...rewdriver CAUTION the setting is very sensitive wiht only turn the pressure rises or drops from 1 Psi or more a turn the screw to the right clockwise to raise the opening pressure b turn to the left c...

Страница 11: ...d water INTRODUCE WATER IN THE MAIN TANK UNTIL THE LEVEL REACHES THE RED CIRCLE OF THE ABOVE SIGHT GLASS IT WILL BE NECESSARY TO REFILL EACH TIME THAT THE WATER LEVEL ENTERS THE DOWN SIGHT GLASS CHECK...

Страница 12: ...HE TUBE BEFORE SWITCHING OFF THE ENGINE WARNING FIX THE TUBE WITH A FLANGE OR ADHESIVE TAPE IN ORDER THAT THE TUBE IS NOT ASPIRED IN CASE OF POWERFUL TURBO ASPIRATIONS AFTER EACH CLEANING CYCLE CHECK...

Страница 13: ...er to re use when the main tank requires to be refilled Even if the drained water is brown can be re used BUBBLER LEVEL FILL WITH TAP WATER UNTIL THE RED POINT IN THE MIDDLE OF THE SIGHT GLASS AFTER E...

Страница 14: ...OMETERS POWER During the cleaning process raise or lower the power with the potentiometer or potentiometers as needed We recommend to regulates the machine always to the maximum power In the model 230...

Страница 15: ...ck the levels every 60 minutes cycle TIMER THE MODELS EQUIPPED WITH ELECTRONIC INCORPORATES A STARTING SENSOR SO THE MACHINE WILL ONLY START IF DETECTS THE ENGINE ON AND IT WILL AUTOMATICALLY STOP IF...

Страница 16: ...S HAPPENS PLEASE CONTACT THE TECHNICAL SERVICE IF EVERYTHING IS CORRECT THE ORTHO OXYHYDROGEN WILL FLOW INTO THE VEHICLE INTAKE AND THE POTENTIOMETRES CAN BE REGULATED AS NEEDED THERMOSTAT DO NO TOUCH...

Страница 17: ...implosion This provoques that all the carbon deposits inside this chamber are burnt including the deposits of the valves injector heads spark plugs piston heads etc With the unique particularity that...

Страница 18: ...chine cleans the particulate filter but does not regenerate After the cleaning cycle make a test drive The 15 first kilometers should be make at high rpm so the gases takes presssure and move outwards...

Страница 19: ...trigger of the welding torch spear A controlled setback will be heard Switch off the machine In the case that we do not have pull the spear trigger and the machine raises the pressure led lights will...

Страница 20: ...lds and melts different types of ceramic Welds glass Cuts in steel and iron ALL WITH NO NOXIOUS SMOKES JUST WITH WATER Our technical commercial service is qualified and trained to explain and demonstr...

Страница 21: ...HE MACHINE MAINTENANCE REFILL THE MAIN DEPOSIT WITH WATER WHEN NECESSARY REFILL OR DRAIN THE WATER OF THE BUBBLER WHEN NECESSARY DRAIN THE WATER OF THE EXTERNAL FILTER WHEN NECESSARY TECHNICAL SHEET T...

Страница 22: ...tem due to overheating or short circuit State of the art technology with 50 increased Ortho Oxyhydrogen gas production Unit equipped with wheels for movements Outer casing completely in satin finished...

Страница 23: ...issions resulting from the fuel combustion Facilitates and allows to pass the vehicle inspection regarding with HC emissions uncombusted hydrocarbons DIGITAL SCREEN LCD screen Power factor control Vol...

Страница 24: ...Page 22 LPH 4600 COMPACT PRO MODEL UNLADEN WEIGHT 90KG TANK CAPACITY 50 L...

Страница 25: ...Page 23 LPH 2300 COMPACT PRO MODEL UNLADEN WEIGHT 55KG TANK CAPACITY 30 L...

Страница 26: ...DOES NOT LIGHTS UP CONTACT YOUR TECHNICAL OR COMMERCIAL SERVICE Check fuses screens and internal wiring connections BLUE FLASHING LEDS AND A BIP AFTER TURNING ON THE MODELS WITH ELECTRONICS The worki...

Страница 27: ...the power potentiometers Check that the filter is firmly closed Check external pipes not damaged or broken Check that the rear solenoide valve does not lose gas closing failure In this case it is eas...

Страница 28: ...ons of the guarantee 1 The guarantee period starts at the time of delivery of the product to the customer 2 To avoid damages the buyer must read the user s manual thoroughly comply with the recomendat...

Страница 29: ...the authorized representative of Econovedades I D i SL The product will be returned preferably in its original packaging 8 In the notification of equipment failure the buyer must indicate Buyer legal...

Страница 30: ...1 Transport of pieces and machine replacement are covered by the guarantee 12 The lifelong guarantee is extended when the maintenance services is yearly hired wich will enter into force from the secon...

Страница 31: ...and directives specified below Directive 2014 35 EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to the making avai...

Страница 32: ...Page 30...

Страница 33: ...34 P g i n a...

Страница 34: ...35 P g i n a...

Страница 35: ......

Страница 36: ...www ecodecarbonizer com www oxyhydrogen technologies com info econovedades com Fabricante Econovedades I D i Econovedades...

Отзывы: