
C
ONNECTING FLEXIBLE MIST HOSES
C
ONNECTING
S
TAINLESS
S
TEEL
P
IPELINES
P
ER DIAGRAM
A
, tighten the nozzles, connectors after
installation securely to ensure the nozzles / connectors
does not leak.
Diagram A
Diagram B
Inlet
ighten the nozzles, connectors after
ensure the nozzles / connectors
P
ER DIAGRAM
B
, assemble the connector by placing
the pipe in this order: No.8→No.6
(2pcs). The peg in the center of the crescent
(No.5) should fit into the hole on the side of pipe. Then,
fasten the nut (No.8) to the connector body.
Code
Description
01 Quick Connector
02 Quick Connector
03 Flexible Mist Hose
04 O-ring
05 Connector
06 Nozzle
07 Flexible Mist Hose
08 Ball Valve
Code
Description
04
Connector
05
Set Pin
06
Gasket
07
O-Ring
08
Nut
09
Pipe
12
Ball Cock
Power Switch
Twin Timer
Air Release
Outlet
Pressure Release
assemble the connector by placing parts on
No.6→No.7→No.6→No.5
The peg in the center of the crescent-shaped pin
(No.5) should fit into the hole on the side of pipe. Then,
fasten the nut (No.8) to the connector body.
Description
Quick Connector
Quick Connector
Flexible Mist Hose
Flexible Mist Hose
Description
Timer
Air Release
GB