Bunn Smart Wave Series Скачать руководство пользователя страница 6

Page 6

INITIAL SET UP

CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when 

specified in the instructions.

1.  Insert an empty funnel into the funnel rails. (FIG 6A)

2.  Place an empty server (customer supplied) under the funnel. For taller servers, lift up on the front of the 

booster plate, and slide it back into the trunk housing.

NOTE: If more height is need, the legs may be extended to a maximum of 1¾˝. (FIG 6B)

3.  Connect the brewer to the power source. 

4.  Press and release the "ENABLE BREW ON/OFF" switch. (Indicator/Display must be lit!). Water will flow into 

the tank and stop when the tank is filled to its capacity. 

5.  Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will 

show  "READY" (green light on Silver Series) when tank is at operating temperature. Some water will drip 

from the funnel during this time; this is due to expansion and is normal part of setup.

6.  Water volumes and flow settings have been preset at the factory. Refer to Adjustments Section of this manual 

to set brew volumes should the volume need to be increased or decreased.

7.  The brewer is now ready for use in accordance with the instructions for Coffee Brewing.

FIG 6B

1¾˝ Max.

FIG 6A

40410  013014

Содержание Smart Wave Series

Страница 1: ...he latest revision of the Operating Manual or to view the Illustrated Parts Catalog Programming Manual or Service Manual please visit the Bunn O Matic website at www bunn com This is absolutely FREE a...

Страница 2: ...atements by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the war...

Страница 3: ...ice personnel only Disconnect power before servicing To reduce the risk of electric shock do not remove or open cover No user serviceable parts inside Authorized service personnel only Disconnect powe...

Страница 4: ...ctrical service as specified in conformance with all local and national codes This appliance must not be cleaned by water jet This appliance is not intended for use by persons including children with...

Страница 5: ...le valve to install the brewer The size and shape of the hole made in the supply line by this type of device may restrict water flow NOTE If a backflow preventer is required by code a shock arrestor s...

Страница 6: ...EW ON OFF switch Indicator Display must be lit Water will flow into the tank and stop when the tank is filled to its capacity 5 Wait approximately twenty minutes for the water in the tank to heat to t...

Страница 7: ...ce an empty server customer supplied under the funnel 6 Verify that the ENABLE BREW ON OFF switch is on 7 Momentarily press and release the desired BREW switch The display will read BREWING flashing r...

Страница 8: ...until it stops 5 Place an empty server customer supplied under the funnel FIG 8B 6 Verify that the ENABLE BREW ON OFF switch is on 7 Momentarily press and release the BREW B switch The display will r...

Страница 9: ...tion will allow the tank to replenish Allow a few minutes for the tank to heat back up to it s ready temperature NOTE 2 Hot water will be available at the faucet in a limited amount when the ENABLE BR...

Страница 10: ...nce approximate of water to be removed from the existing setting Press and hold the small BREW switch until you hear the solenoid click on and off three times approximately 10 seconds then release the...

Страница 11: ...the tank to heat back up to it s ready temperature NOTE 2 Hot water will be available at the faucet in a limited amount when the ENABLE BREW ON OFF switch is in the OFF position because the tank will...

Страница 12: ...e middle bars on the display will be on After 10 Seconds the the 3 upper middle and lower bars on the display will be lit for 5 seconds During that 5 seconds release and again press the ENABLE BREW ON...

Страница 13: ...he display will then change to 1 14 Brewer has 14 preset pulse brew routines to choose from Factory default is 1 With 14 being the maximum time Press BREW A to decrease or BREW B to increase 6 Press a...

Страница 14: ...e sprayhead by turning it to the left with your fingertips and set it aside 4 With the sprayhead removed insert the deliming spring pro vided all the way into the sprayhead tube When inserted properly...

Страница 15: ...ove the sprayhead by turning it counterclockwise with your fingertips 3 Disassemble sprayhead by removing rubber gasket 4 Check the holes in the sprayhead If plugged by lime they may be cleared using...

Страница 16: ...e the brew funnel 2 Remove upper and lower screws on either side of front cover 3 Loosen middle screw on either side of front cover 4 Pull front cover towards front of brewer Top Cover 1 Remove both s...

Страница 17: ...proceeding 2 Remove the brew funnel 3 Remove the front cover 4 Pinch fill hose 5 Loosen clamp from fill solenoid 6 Remove hose from solenoid and drain into sink as shown or 2 gallon bucket 7 After dr...

Страница 18: ...itches as needed NOTE All switches are turned OFF from factory FIG 18A KEY FUNCTION OFF FUNCTION ON 4 High altitude Set temp 200 F 93 C Set temp 190 F 87 8 C 3 Energy Save No energy save mode Drops to...

Страница 19: ...R OPEN CALL SERVICE 3 ER 3 HEATING TOO LONG CALL SERVICE 4 ER 4 REFILL TOO LONG CHECK WATER SUPPLY 5 ER 5 HIGH TANK LEVEL DURING BREW DELIME 6 ER 6 CHECK ENABLE BREW ON OFF SWITCH CHECK SWITCH 7 ER 7...

Страница 20: ...N ON 0 OFF ORN 12 ORN GRN TAN WHI ORN 12 WHI PNK RED BLK ON 0 OFF GRN YEL WHI RED RED LEVEL PROBE DISPLAY BOARD t J3 1 BLK 5V HOT 4 5V COLD BLU L1 N AIR PUMP MOTOR 12VDC WATER INLET SOLENOID 1 BRN ORN...

Страница 21: ...K BLK 14 RED BLK RED WHI WHI BLK J2 1 J5 1 BRN ON 0 OFF ORN 12 ORN GRN TAN WHI ORN 12 WHI PNK RED BLK ON 0 OFF GRN YEL WHI RED RED LEVEL PROBE DISPLAY BOARD t J3 1 BLK 5V HOT 4 5V COLD BLU AIR PUMP MO...

Страница 22: ...N 0 OFF ORN 12 ORN GRN TAN WHI ORN 12 BLK PNK RED BLK ON 0 OFF GRN YEL WHI RED RED LEVEL PROBE DISPLAY BOARD t J3 1 WHI 5V HOT 4 5V COLD BLU L1 N AIR PUMP MOTOR 12VDC WATER INLET SOLENOID 1 BRN ORN 12...

Страница 23: ...BLK WHI WHI WHI BLK J2 1 J5 1 BRN ON 0 OFF ORN 12 ORN GRN TAN WHI ORN 12 BLK PNK RED BLK ON 0 OFF GRN YEL WHI RED RED LEVEL PROBE DISPLAY BOARD t J3 1 WHI 5V HOT 4 5V COLD BLU L1 N AIR PUMP MOTOR 12VD...

Отзывы: