
L
L
Rope installation, runners:
OD0821 ROCKfrog
© 2 0 2 1
K U R T B E I E R & K A T I Q U I N G E R
Minimum ground clearance: 4 cm
5 adjustment options in 5 cm steps:
Possible ceiling heights: 230/235/240/245/250.
The adjustments have to be identical front/back and left/right.
Attention! In case of made-to-measure products, the
basic position
is defined in the
middle (i.e. position P3)
of the adjustment
options. Thus, you are able to adjust the height each by two steps upward and downward. For a detailed description,
please see
“Montage bei Maßanfertigung”
.
Rope position:
The rope lying up front in the carbine is
also hooked in at the front of the runner.
The rope lying in the back in the carbine
is hooked in at the back of the runner.
Bodenabstand mind. 4 cm
L
L
L
P1
Positions
P1
L
L
L
P1
P1
P1
P1
P2
P3
P4
P4
P5
P5
P5
Attention!
All 4 ropes have to be fastened in the same position
at the front and the back.
Example below:
4 x at the outermost position (L)
and 4 x at position (P1).
If you should e.g. have a ceiling height of 230, please
use position (L) 4 times and position (P5) 4 times, etc.
The loop must always be fastened at position (P1, P2, P3, P4 or P5);
at position (L), the rope is wrapped around a bolt (U1).
P2 P3
U1
U1
U1
U1