background image

1.  Insert the muffler end of the CH1000 cooling vest 

connector hose well into the air entry sleeve of the vest 

leaving 2” of the connector hose exposed (Figure 1).

2. Install the small nylon clamp over the air entry sleeve 

and cooling vest connector hose. Engage the clamp 
locks and squeeze until tight (Figure 2).

heat shield Instructions

assembly

The heat shield is designed to work with the standard nylon 

belt (part # 4612) supplied with the climate control devices, 

or the 36501 vinyl belt which may be ordered separately.
1.  Determine whether the climate control device will be 

worn vertically or horizontally on the waist.

2.  If the device will be worn in the horizontal position, align 

the tube on the heat shield as shown in Figure 3. If the 

tube will be worn in the vertical position, align the tube 

on the heat shield as shown in Figure 4.

3.  Lace the belt supplied with your climate control device 

through both the heat shield slots and the climate control 

belt bracket slots.

4.   Use plastic zip tie to secure the climate control unit to 

the heat shield.

assembling the cooling Vest

Back of vest

Figure 1

Figure 2

Figure 3

Figure 4

Отзывы: