
6-2
N
ovaS
c
ale R423-E2 Installation and User's Guide
6-2 Control Panel
The control panel (located on the front of the chassis) must be connected to the
JF1 connector on the serverboard to provide you with system status indications. A
ribbon cable has bundled these wires together to simplify the connection. Connect
the cable from JF1 on the serverboard to JP4 on the Control Panel PCB (printed
circuit board). Make sure the red wire plugs into pin 1 on both JF1 and JP4. Pull all
excess cabling out of the airflow path. The LEDs inform you of system status. See
Control Panel LEDS
on page 3-2 for details on the LEDs and the control panel
buttons. See
Front Control Panel
on page 5-20 for details on JF1.
Figure 6-1. R423-E2 Control Panel
Содержание Novascale R423-E2
Страница 1: ...NOVASCALE R423 E2 Installation and User s Guide REFERENCE 86 A1 52FA 00 ...
Страница 2: ......
Страница 10: ...Notes viii NovaScale R423 E2 Installation and User s Guide ...
Страница 16: ...1 6 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 21: ...Chapter 2 Server Installation 2 5 Figure 2 1 Installing Chassis Rails ...
Страница 23: ...Chapter 2 Server Installation 2 7 Figure 2 2 Installing the Server into a Rack ...
Страница 25: ...Chapter 2 Server Installation 2 9 Figure 2 3 Accessing the Inside of the System ...
Страница 30: ...NovaScale R423 E2 Installation and User s Guide 3 4 Notes ...
Страница 110: ...7 30 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 112: ...A 2 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 122: ...B 10 NovaScale R423 E2 Installation and User s Guide ...
Страница 142: ...C 20 NovaScale R423 E2 Installation and User s Guide ...
Страница 144: ...D 2 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 145: ......
Страница 146: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 52FA 00 ...