
Chapter 2: Server Installation
2-1
Chapter 2. Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your NovaScale R423-E2 up
and running. Following these steps in the order given should enable you to have
the system operational within a minimum amount of time. This quick setup assumes
that your system has come to you with the processors and memory preinstalled. If
your system is not already fully integrated with a serverboard, processors, system
memory etc., please turn to the chapter or section noted in each step for details on
installing specific components.
2-2 Unpacking the System
You should inspect the box the NovaScale R423-E2 was shipped in and note if it
was damaged in any way. If the server itself shows damage you should file a dam
-
age claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the NovaScale R423-E2.
It should be situated in a clean, dust-free area that is well ventilated. Avoid areas
where heat, electrical noise and electromagnetic fields are generated. You will also
need it placed near a grounded power outlet. Read the Rack and Server Precau-
tions in the next section.
2-3 Preparing for Setup
The box the NovaScale R423-E2 was shipped in should include two sets of rail
assemblies, two rail mounting brackets and the mounting screws you will need to
install the system into the rack. Follow the steps in the order given to complete
the installation process in a minimum amount of time. Please read this section
in its entirety before you begin the installation procedure outlined in the sections
that follow.
Содержание Novascale R423-E2
Страница 1: ...NOVASCALE R423 E2 Installation and User s Guide REFERENCE 86 A1 52FA 00 ...
Страница 2: ......
Страница 10: ...Notes viii NovaScale R423 E2 Installation and User s Guide ...
Страница 16: ...1 6 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 21: ...Chapter 2 Server Installation 2 5 Figure 2 1 Installing Chassis Rails ...
Страница 23: ...Chapter 2 Server Installation 2 7 Figure 2 2 Installing the Server into a Rack ...
Страница 25: ...Chapter 2 Server Installation 2 9 Figure 2 3 Accessing the Inside of the System ...
Страница 30: ...NovaScale R423 E2 Installation and User s Guide 3 4 Notes ...
Страница 110: ...7 30 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 112: ...A 2 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 122: ...B 10 NovaScale R423 E2 Installation and User s Guide ...
Страница 142: ...C 20 NovaScale R423 E2 Installation and User s Guide ...
Страница 144: ...D 2 NovaScale R423 E2 Installation and User s Guide Notes ...
Страница 145: ......
Страница 146: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 52FA 00 ...