GAS 222.20 DH
4.4 Installing the downstream filter
NOTICE
The downstream filter and the O-ring for the handle must be inserted prior to first star-
tup.
Operating without downstream filter prohibited!
O-ring handle
Attach an O-ring suitable for the expected ambient temperature to the handle.
Attach the downstream filter to the handle. Then carefully insert the handle with
filter in the gas probe and turn 90° to secure.
Verify the handle is seated correctly. When seated correctly it locks onto the filter
housing.
4.5 Insulation
On heated probes completely insulate any exposed flange areas and, if applicable, the connection piece to absolutely prevent
thermal bridges. The insulating material must meet the application requirements and be weatherproof.
4.6 Connecting the Gas Line
The sample gas line must be carefully and properly connected using a suitable fitting.
This table provides an overview of the sample gas probe connections:
Probe
GAS 222
Reservoir
PAV01
Ball valve
pneumatic drive
Control valve
3/2-way solenoid
valve
Connecting flange
1)
DN65/PN6/
DN3“-150
2)
Sample gas inlet
G3/4
Sample gas outlet
NPT 1/4
Blowback connection
G3/8
Test gas connection
1)
Tube Ø6 mm
Tube Ø1/4
2)
Filling port
NPT 1/4
Condensate
G1/2
Bypass
NPT 1/4
Control air
G1/8
G1/4
NPT 1/4
Tab. 1:
Gas Probe Connections (Varies by Model)
1)
Varies by version.
2)
Only GAS 222.xx ANSI and GAS 222.xx AMEX
WARNING
Gas emanation
Sample gas can be harmful to the health!
Check the lines for leaks.
8
Bühler Technologies GmbH
BE460045 ◦ 10/2019
Содержание GAS 222.20 DH
Страница 20: ...GAS 222 20 DH 9 3 Dimensions 18 Bühler Technologies GmbH BE460045 10 2019 ...
Страница 23: ......
Страница 24: ......
Страница 32: ...DE 461099 05 2021 Page 8 9 ...