15
Operation - Grain Vac
WARNING
Do not run the airlock in the reverse direction. Damage may
occur to the hydraulic motor.
Airlock Rotation
Check the rotation of the airlock. Coupler should turn as indicated by arrow.
If airlock rotates in wrong direction, stop and reverse direction of control lever on the tractor,
or shut down the hydraulic system and reverse the order of the hoses plugged into the tractor
couplers.
Breaking In
Your machine has been operated for a short time at the factory to assure good performance. It
can however not be considered broken in. It normally takes 5 to 10 hours of operation for all parts
to be polished by the grain stream and for the machine to come up to full capacity.
We recommend the following checks during the break in period:
A. After operating for 1/2 hour -
1.
Check for overheated bearing. Lubricate or adjust as required*.
2.
Check for oil leaks. Tighten or replace part and oil as required*
For Best Performance
1.
Working area should be reasonably level
and dry.
2.
The tractor should be positioned to have the
driveline angles at a minimum.
3.
The Farm King Grain Vac should be located
so the intake line is as straight and as short
as possible.
4.
When using the Farm King Grain Vac to
load trucks, make sure there is adequate
room for the receiving vehicle to get under
the discharge cyclone.
3.
Retorque all hardware - Wheel bolts and fasteners.
4.
Check belt tension and adjust as required*.
5.
Check the oil levels in the blower reservoirs. If low, add oil as required. Check for leaks and
correct if problem persists*.
* Check maintenance section for proper procedures. (Also see page 30 for hydraulic safety)
WARNING
High pressure fluids can penetrate the skin and cause
infection and toxic reaction.
Содержание Farm King Grain Vac Conveyair 6640
Страница 1: ...Operator and Parts Manual 052012 Grain Vac Conveyair 6640 FK376...
Страница 2: ......
Страница 40: ...40 Parts list Diagrams Grain Vac Description Receiver Tank Dust Collector 20a 20b 25 24...
Страница 42: ...42 Parts list Diagrams Grain Vac Description Airlock Blower Assemblies 18 26 27...
Страница 44: ...44 Parts list Diagrams Grain Vac Description Boom Cyclone See Page 27 for installation instruction...
Страница 46: ...46 Parts list Diagrams Grain Vac 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 16A Description Belt Drive...
Страница 48: ...48 Parts list Diagrams Grain Vac Description Cleanup Full Bin Nozzles...
Страница 50: ...50 Parts list Diagrams Grain Vac Description Steel Flex Hose Couplers 1 2 2 3 3 4 4a 4c 4b 5 6 7 8 9...
Страница 52: ...52 Parts list Diagrams Grain Vac Description Cleanup Hose Couplers 1 2 2 3 4 5 6 7 8 9 10...
Страница 58: ...58 Parts list Diagrams Grain Vac Description Standard Hydraulic System 1 12 11 10 12 8 7 9 5 13 4 3 2 6...
Страница 61: ......