bühler
Allied Front-End
Loader
P4493
- 40 -
Possible Attachment Interference (2895E TSL & 2895E S TSL)
Regular loader linkage setup allows for
maximum rollback.
TSL loader linkage setup provides reduced
rollback.
When fully rolled back, large attachments
(such as the C2000 Grapple) may contact
the 2895E TSL or the 2895E S TSL pivot
plate. This interference is avoided in
factory assembly by installing the linkages
(item 12) in the limited rollback position.
These linkages can be reversed to
increase attachment rollback if large
attachments are not used. See following
description below to reverse links.
Before reversing the linkages, remove
attachments and engage the hydraulic
loader lock (refer to page 23 for hydraulic
loader lock instructions).
Refer to pages 36 and 37 for
corresponding item and part numbers.
Remove the 1.25 x 7.25 pin (item 40)
connecting the linkages (items 11 & 12).
Remove the 1.25 x 6.25 pin (item 17)
connecting the linkages (item 12) to the
quick attach (item 2).
Reverse the all four linkages (item 12), and
reinstall pins and quick attach.
Note: For maximum rollback, the flat side of
the linkages (item 12) with one notch should be
facing forward. For limited rollback, the arced
side of the linkages with two notches should be
facing forward.
Содержание 2895E
Страница 1: ......
Страница 4: ...bühler Allied Front End Loader 2 P4493 LOADER SPECIFICATIONS Illustration TSL shown ...
Страница 10: ...bühler Allied Front End Loader 8 P4493 Safety Decal Location ...
Страница 34: ...bühler Allied Front End Loader P4493 32 2895E 2895E S Main Frame Assembly 5 ...
Страница 36: ...bühler Allied Front End Loader P4493 34 2895E 2895E S Hydraulic Plumbing Assembly ...
Страница 38: ...bühler Allied Front End Loader P4493 36 2895E TSL 2895E S TSL Main Frame Assembly 45 45 ...
Страница 45: ......