bühler
Allied Front-End Loader
- 18 -
P4493
INSTALLING / REMOVING LOADER
Installing:
CAUTION
Prior to initial mounting, cycle loader cylinders to
displace air. This ensures the loader will remain in the storage position and
operate consistently.
1. Position the tractor centrally and parallel
to the loader uprights. Drive forward slowly
until the loader hydraulic hoses can be
coupled. Shut tractor off and set park brake.
Couple the loader hoses to the matched color
code identifiers on the auxiliary valve for
proper orientation of loader operation.
2. Extend lift cylinders to tilt both loader
uprights approximately 30 degrees. Rollback
bucket to further raise upright for additional
clearance. Both upright base pivots must be
above the loader mount cradle.
CAUTION
Verify front and side clearances during installation to
avoid tractor damage. Position hydraulic hoses such that they will not be
pinched or stretched during installation.
3. Slowly drive the tractor forward until the
upright base pivot contacts the mount plate.
4. Slowly extend the bucket and retract the
lift cylinders to lower the upright pivot into the
mount plate cradle. Ensure both uprights are
fully engaged within the mount plate cradle.
Содержание 2895E
Страница 1: ......
Страница 4: ...bühler Allied Front End Loader 2 P4493 LOADER SPECIFICATIONS Illustration TSL shown ...
Страница 10: ...bühler Allied Front End Loader 8 P4493 Safety Decal Location ...
Страница 34: ...bühler Allied Front End Loader P4493 32 2895E 2895E S Main Frame Assembly 5 ...
Страница 36: ...bühler Allied Front End Loader P4493 34 2895E 2895E S Hydraulic Plumbing Assembly ...
Страница 38: ...bühler Allied Front End Loader P4493 36 2895E TSL 2895E S TSL Main Frame Assembly 45 45 ...
Страница 45: ......