For back grading, either load the bucket and
position the heel on the ground or position
the bucket at 40
q
or less below level as
shown. Place the valve in the float position
and back up slowly.
IMPORTANT:
Float position must be used to
reduce down pressure, otherwise cylinder
rod(s) and/or bucket damage could occur.
A – Frame:
Standard and Heavy Duty A – Frames can be fitted with either
spears or pallet forks.
- Standard Duty
The standard duty frame is for handling
medium sized round bales (up to 1000 lbs.)
fitted with a single centered 1240mm long
heat treated spear and two short stabilizers.
For pallet applications with a maximum load
up to 2000 lbs. when fitted with 42.0” fork kit.
- Heavy Duty 60”
The Heavy Duty 60” frame is for handling
medium to large sized round bales (up to
2000 lbs.) when fitted with two bottom
1240mm long heat treated spears and two
short stabilizers. For pallet applications with
a maximum payload of 4400 lbs. when fitted
with the 48.0” fork kit.
NOTE:
The heavy duty frame can also be
fitted using only the one center spear as per
the standard duty A-frame.
Содержание 2895E
Страница 1: ......
Страница 4: ...bühler Allied Front End Loader 2 P4493 LOADER SPECIFICATIONS Illustration TSL shown ...
Страница 10: ...bühler Allied Front End Loader 8 P4493 Safety Decal Location ...
Страница 34: ...bühler Allied Front End Loader P4493 32 2895E 2895E S Main Frame Assembly 5 ...
Страница 36: ...bühler Allied Front End Loader P4493 34 2895E 2895E S Hydraulic Plumbing Assembly ...
Страница 38: ...bühler Allied Front End Loader P4493 36 2895E TSL 2895E S TSL Main Frame Assembly 45 45 ...
Страница 45: ......