2006 Buell P3: Electric Starter
5-19
ASSEMBLY
1.
See
Clean, inspect and lubricate drive
assembly components. Lubricate parts with high temper-
ature grease, such as LUBRIPLATE 110.
2.
When installing drive assembly compo-
nents, open end of idler bearing cage (19) faces toward
solenoid.
3.
When installing drive housing (16) to solenoid housing
(24), use
new
o-ring (17). Be sure to install return spring
(23) and ball (22).
4.
Lubricate armature bearings (10) with high temperature
grease, such as LUBRIPLATE 110. Install armature (11)
and field frame (7) to solenoid housing (24).
5.
Install brushes and brush holder (4).
6.
Install o-rings (5). Attach end cover (3) with end cover
screws and o-rings (2).
7.
Install thru-bolts (1).
8.
Attach field wire (9) to solenoid housing (24) with field
wire nut and washer (8) (metric). Replace rubber boot.
INSTALLATION
1.
Install starter and starter gasket from the right side.
2.
Connect wiring to starter.
a.
Connect solenoid wire (2).
b.
Attach positive battery cable ring terminal (1) and
install nut with washer (1) (metric). Tighten to 80-
100
in-lbs
(9-11 Nm).
c.
Replace protective boot.
3.
See
Install both starter mounting bolts and
washers. Tighten to 13-20 ft-lbs (18-27 Nm).
4.
Position oil hoses in clamp and install clamp to through
bolt with
new
locknut. Make sure hoses are not kinked or
restricted.
5.
Install primary cover. See
6.
Fill transmission to proper level with fresh lubricant. See
1.11 TRANSMISSION/PRIMARY FLUID
.
7.
Install left side footrest support assembly. See
FOOTPEGS AND FOOTPEG SUPPORT BRACKETS
.
8.
Install air cleaner. See
.
1
WARNING
1
WARNING
Connect positive (+) battery cable first. If positive (+)
cable should contact ground with negative (-) cable con-
nected, the resulting sparks can cause a battery explo-
sion, which could result in death or serious injury.
(00068a)
9.
Connect battery cables, positive cable first. Tighten ter-
minal hardware to 72-96 in-lbs (8-11 Nm).
1
WARNING
1
WARNING
After installing seat, pull upward on front of seat to be
sure it is in locked position. While riding, a loose seat can
shift causing loss of control, which could result in death
or serious injury. (00070a)]
10. Install seat. See
.
Figure 5-27. Starter Wires
7768
1.
Positive battery ring terminal
2.
connector [128]
2
1
Figure 5-28. Starter Mounting Bolts and Washers
(Primary Side)
7766
Содержание 2006 P3
Страница 2: ...1 2 Edit Me Printed April 15 2005 10 56 am ...
Страница 24: ...B 8 Appendix B Wiring HOME 2006 Buell Blast P3 Model Main Harness 2006 Buell Blast P3 Model Main Harness ...
Страница 26: ...B 10 Appendix B Wiring HOME 2006 Buell Blast P3 Model Starting 2006 Buell Blast P3 Model Starting ...
Страница 28: ...B 12 Appendix B Wiring HOME 2006 Buell Blast P3 Model Charging 2006 Buell Blast P3 Model Charging ...
Страница 32: ...B 16 Appendix B Wiring HOME 2006 Buell Blast P3 Model Lighting 2006 Buell Blast P3 Model Lighting ...
Страница 34: ...B 18 Appendix B Wiring HOME 2006 Buell Blast P3 Model Ignition 2006 Buell Blast P3 Model Ignition ...
Страница 37: ...C 3 Appendix C Metric Conversions HOME ...
Страница 48: ...1 10 2006 Buell P3 Maintenance HOME NOTES ...
Страница 86: ...1 48 2006 Buell P3 Maintenance HOME NOTES ...
Страница 88: ......
Страница 132: ...2 44 2006 Buell P3 Chassis HOME NOTES ...
Страница 164: ......
Страница 165: ......
Страница 215: ...3 50 2006 Buell P3 Engine HOME NOTES ...
Страница 249: ......
Страница 277: ...4 28 2006 Buell P3 Fuel System HOME NOTES ...
Страница 279: ......
Страница 280: ......
Страница 317: ...6 16 2006 Buell P3 Drive Transmission HOME NOTES ...
Страница 343: ...6 42 2006 Buell P3 Drive Transmission HOME NOTES ...
Страница 345: ......
Страница 419: ......