Boiler installation
7
17
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
7.4
Installation of Logamatic 2107 control (accessory)
The boiler is fully functional with the factory-installed
aquastats. The Logamatic 2107 control can also be
installed in addition to the factory-installed aquastats.
1.
Unscrew left and right screws in the side panels, lift
front panel up, pull down and remove to the front.
2.
Unscrew the two fastening screws on the back boiler
jacket. Lift the back boiler jacket and remove to the
back.
USER NOTE
Note the following when making electrical
connections:
z
Lay out cables and capillaries carefully.
z
Do not bend the capillaries during
installation.
z
Never carry out any electrical work on
the heating system unless you are
licensed for this type of work. If you are
not a licensed electrician, have a
specialist electrical company make the
electrical connections.
z
Observe the local regulations.
Fig. 12
Removing front panel of boiler
Fig. 13
Removing boiler jacket