10
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Moving the boiler
5
5
Moving the boiler
This chapter describes how to move the boiler safely,
5.1
Moving the boiler with boiler cart
Move the boiler with packaging and on pallet as much as
possible.
z
Position transport equipment (e.g. boiler cart) at the
back of the boiler.
z
Secure boiler to cart.
z
Move the boiler to the installation location.
z
Remove the straps and the cardboard packaging.
z
Remove the bolts from the pallet.
z
Lift the boiler at the sides and slide to the edge of the
pallet. Place a pipe under the boiler and roll it on
additional pipes to the installation location.
z
Place the boiler in its final position.
CAUTION!
SYSTEM DAMAGE
due to bumps.
z
Check the transport diagrams on the
packaging to protect the sensitive
components from damage by bumping.
USER NOTE
z
Protect the boiler connections from dirt
if the boiler is not installed immediately.
USER NOTE
Dispose of the packaging material in an
environmentally compatible fashion.
Fig. 5
Moving boiler with boiler cart
CAUTION!
RISK OF INJURY
if the boiler is not properly secured to the
trolley.
z
Use suitable transport equipment, such
as a boiler cart with a belt.
z
Secure the boiler to prevent it from
falling.
Fig. 6
Moving the boiler