Index
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
59
Index
A
Aquasmart
..........................................................
B
B-kit components
.....................................................
Boiler output
..........................................................
Boiler room
.........................................................
Boiler type
............................................................
Burner, notes on commissioning
...................................
C
Changing boiler hinges to left hand side
Checking for leaks (CH system)
.....................................
Cleaning heat exchanger
............................................
Combustion air supply
..............................................
Commissioning
.....................................................
log
...............................................................
Connecting power supply
...........................................
Connecting the fuel supply
.........................................
Connections
..........................................................
Correcting burner faults
............................................
D
Dimensions
...........................................................
Dirt trap
............................................................
E
Environment
........................................................
F
Fitting B-kit
.........................................................
Fitting burner door panel
...........................................
Fitting cable ties
....................................................
Fitting outer casing panels
..........................................
Fitting temperature sensor assembly
...............................
Fitting the controls
.................................................
Flow temperature
.....................................................
Fuel
.................................................................
H
Heat exchanger baffles, checking position
Heating circuits, multiple
...........................................
Heating emergency stop switch
.....................................
HydroStat
...........................................................
I
Installation diagram
.................................................
Installation examples
...............................................
Installation of boiler drain
...........................................
L
Log, commissioning
................................................
Logs, servicing and maintenance
...................................
M
Main isolating cock
..................................................
Main isolating valve
..................................................
Maintenance, regular
................................................
Master switch
.......................................................
Mounting the adjustable feet
........................................
Mounting the burner
.................................................
O
On/Off switch
.......................................................
Onsite testing pressure
..............................................
Operating Conditions
...............................................
Operating conditions
.................................................
P
Pack contents
........................................................
Parts lists
............................................................
Permissible operating pressure
......................................
Power supply voltagePower supply
.................................
Pressure testing nozzle
..............................................
Pressure/temperature gauge
...................................
,
R
Raising flue gas temperature
........................................
Rated heat output
....................................................
Removing burner door panel
........................................
Removing burner hood
..............................................
Removing heat exchanger baffles
...................................
Replacing rope gasket
...............................................
Reversing boiler door
................................................
Routing burner cable
................................................
S
Safety
................................................................
Safety valve
...............................................
,
Shutting down
.......................................................
Site test pressure
...................................................
Specifications
........................................................
T
Temperature/pressure gauge
..................................
,
Topping up
..........................................................
Transporting with boiler trolley/sack truck
..........................
Troubleshooting
.....................................................
W
Wall clearances
......................................................
Water quality
........................................................
Wet cleaning
........................................................