8
Heating system servicing
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
40
On-demand maintenance procedures
Page
Date:______
Date:______
Date:______
1.
Shutting down the heating system
2.
Removing and cleaning the heat exchanger baffles
3.
Cleaning heat exchanger heater flue (heating surfaces) and
combustion chamber and afterwards refitting heat exchanger baffles in
original positions
4.
Checking seals/cord gaskets on burner door and burner and replacing
as necessary
5.
Commissioning the heating system
6.
Final check of the servicing work
7.
Checking safe and proper operation
Confirmation of properly completed servicing
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature