background image

For the contractor

Please read these instruc-
tions carefully

Propane Conversion kit 
instructions

Condensing gas boiler

Logamax plus

Required Input Rates

Logamax plus GB162-(L.B)80 kW

Logamx plus GB162-(L.B.)100 kW

270,000 btu/hr

315,000 btu/hr

This kit and instructions are for converting the GB162 model 
boilers from Natural Gas to Liquid Propane.

WARNING!

This conversion kit shall be installed by a qualified service agency 
in accordance with the manufacturer‘s instructions and all 
applicable codes and requirements of the authority having 
jurisdiction.
The information in these instructions must be followed to 
minimize the risk of fire or explosion or to prevent property 
damage, personal injury or death. The qualified service agency
is responsible for the proper installation of this kit.
The installation is not proper and complete until the operation of 
the converted boiler is checked as specified in the manufacturer‘s 
instructions supplied with the kit.

CAUTION!

The gas supply shall be shut off prior to disconnecting the 
electrical power, before proceeding with the conversion.

Notice! Save these instructions for later use.

6720615152-001.1TD

GB162-80 kW
GB162-100 kW
GB 162-L.B. 80kW
GB 162-L.B. 100kW

6 72

0 615

 033

 (

11/

20

10) U

S

/CA

Содержание Condensing gas boiler

Страница 1: ...of the authority having jurisdiction The information in these instructions must be followed to minimize the risk of fire or explosion or to prevent property damage personal injury or death The qualifi...

Страница 2: ...rnings 3 1 4 Additional symbols 3 2 Parts list for converting the boiler to propane 4 3 Liquid Propane conversion 5 3 1 Shut down the boiler 5 3 2 Changing the gas valve assembly 5 3 3 Testing for gas...

Страница 3: ...e severe personal injury death or substantial property damage WARNING Indicates the presence of hazards that can cause severe personal injury death or substantial property damage CAUTION Indicates pre...

Страница 4: ...nverting the boiler to propane Conversion kit propane for the GB162 80 kW 100 kW 7746900499 includes assembly 774601703A 1 gas valve propane venturi orifice 774600958A orifice 871860872A 8 000ft 1 lab...

Страница 5: ...the boiler door 3 2 Changing the gas valve assembly B Loosen the screw connection on the gas valve fig 3 1 and pull the plugs fig 3 2 from the gas valve Fig 3 Undoing the connections to the gas valve...

Страница 6: ...746900499 B If the boiler is installed above 8 000 ft 2 440 m altitude the orifice needs to be changed Follow the instructions below Otherwise go to the next step Undo the 4 screws fig 9 1 and remove...

Страница 7: ...parts in reverse order When re installing the burner plate make sure that the notch is on the right hand side fig 15 Fig 15 Re installing the burner plate B Carry out the start up activities and compl...

Страница 8: ...r Fig 16 Measuring the gas supply pressure B Press on the control panel cover to open it Fig 17 Opening the control panel B Switch on the boiler by setting the main switch to position 1 fig 1 page 5 B...

Страница 9: ...crew fig 19 1 The adjustment screw is located behind the cover screw Fig 19 Setting the gas air ratio B Press repeatedly the Service e button until the temperature indication is displayed B Press the...

Страница 10: ...ler if any part has been under water Immediately call a qualified service technician to inspect the boiler and to replace any part of the control system and any gas control which has been under water...

Страница 11: ...smell for gas including near the floor If you smell gas STOP and see the safety information on page 10 If you do not smell gas go to the next step B Install the casing again B Open the gas shut off v...

Страница 12: ...6720615033 0005...

Отзывы: