Liquid Propane conversion

Logamax plus GB162-80 kW/100 kW - We reserve the right to make any changes due to technical modifications!

9

3.5

Checking and adjusting the gas/air 
ratio

B

Switch off the boiler using the main switch.

B

Loosen the screw plug on the measuring nipple for the 
burner pressure by 2 rotations (

Æ

 fig. 18 [1]).

B

Set the pressure gauge to 0.

B

Use a hose to connect the plus terminal of the pressure 
gauge to the burner pressure measuring nipple 
(

Æ

fig. 18, [2]).

Fig. 18 Checking the gas/air ratio

B

Switch on the boiler using the main switch.

B

Press the “Chimney Sweep” 

button and hold it for 

approx. 2 seconds until the display shows the decimal 
point.

B

Press and hold the “Chimney Sweep” 

and “Service” 

button, for approx. 5 seconds, until the display 

shows 

.<D

(e. g. 

.<D

).

B

Set the boiler to partial load (

Æ

Tab. 3).

B

Pressing the “Chimney Sweep” 

button for higher 

values or the “Reset” 

button for lower values.

B

Read out the differential pressure.
The differential pressure (p

Gas

– p

Air

) must be 

-0.04" W.C. (-10 Pa) (±0.02 " W.C. = ± 5 Pa) 
(read-out on pressure gauge:
-0.06 – -0.02" W.C. = -15 – -5 Pa).

B

Enter the value measured in the start-up report.

B

Adjust the gas/air ratio, if not correct, using the 
adjustment screw (

Æ

fig. 19, [1]). The adjustment 

screw is located behind the cover screw.

Fig. 19 Setting the gas/air ratio

B

Press repeatedly the “Service” 

button until the 

temperature indication is displayed.

B

Press the “Chimney Sweep” 

button until the 

decimal point is cleared from the display.

B

Switch off the boiler using the main switch.

B

Remove the measurement set-up, tighten the screw in 
the burner pressure measuring nipple.

B

Switch on the boiler using the main switch.

3.6

Carrying out a tightness test in 
operating conditions

B

Check all gaskets and joints in the burner gas circuit for 
leaks while the burner is operational, using a leak 
detection agent.

3.7

Measuring the CO content

B

Measure the CO content on the flue gas sampling 
point (

Æ

fig. 20, [1]).

The CO values in an air-free condition must be below 
400 ppm or 0.04 vol. %.
Values of 400 ppm and up indicate that the burner 
adjustment may be wrong, the gas burner fitting or the 
heat exchanger are dirty or that there may be burner faults.

altitude

ft. (m)

Display setting
GB162-80 kW

Display setting
GB162-100 kW

0-4,000 ft.

(0-1,220)

.<D

.<D

4,000-10,200

(01,220-10,200)

.<D

.<D

Tab. 3

Partial load set.

1

2

6720615033-019.1TD

CAUTION: 

due to a short circuit.

B

Cover damageable parts before leak 
testing.

B

Do not spray the leak detection agent onto 
cables, plugs or electrical connection 
lines. Do not allow it to drip onto them 
either.

6720615033-020.1TD

1

Содержание Condensing gas boiler

Страница 1: ...of the authority having jurisdiction The information in these instructions must be followed to minimize the risk of fire or explosion or to prevent property damage personal injury or death The qualifi...

Страница 2: ...rnings 3 1 4 Additional symbols 3 2 Parts list for converting the boiler to propane 4 3 Liquid Propane conversion 5 3 1 Shut down the boiler 5 3 2 Changing the gas valve assembly 5 3 3 Testing for gas...

Страница 3: ...e severe personal injury death or substantial property damage WARNING Indicates the presence of hazards that can cause severe personal injury death or substantial property damage CAUTION Indicates pre...

Страница 4: ...nverting the boiler to propane Conversion kit propane for the GB162 80 kW 100 kW 7746900499 includes assembly 774601703A 1 gas valve propane venturi orifice 774600958A orifice 871860872A 8 000ft 1 lab...

Страница 5: ...the boiler door 3 2 Changing the gas valve assembly B Loosen the screw connection on the gas valve fig 3 1 and pull the plugs fig 3 2 from the gas valve Fig 3 Undoing the connections to the gas valve...

Страница 6: ...746900499 B If the boiler is installed above 8 000 ft 2 440 m altitude the orifice needs to be changed Follow the instructions below Otherwise go to the next step Undo the 4 screws fig 9 1 and remove...

Страница 7: ...parts in reverse order When re installing the burner plate make sure that the notch is on the right hand side fig 15 Fig 15 Re installing the burner plate B Carry out the start up activities and compl...

Страница 8: ...r Fig 16 Measuring the gas supply pressure B Press on the control panel cover to open it Fig 17 Opening the control panel B Switch on the boiler by setting the main switch to position 1 fig 1 page 5 B...

Страница 9: ...crew fig 19 1 The adjustment screw is located behind the cover screw Fig 19 Setting the gas air ratio B Press repeatedly the Service e button until the temperature indication is displayed B Press the...

Страница 10: ...ler if any part has been under water Immediately call a qualified service technician to inspect the boiler and to replace any part of the control system and any gas control which has been under water...

Страница 11: ...smell for gas including near the floor If you smell gas STOP and see the safety information on page 10 If you do not smell gas go to the next step B Install the casing again B Open the gas shut off v...

Страница 12: ...6720615033 0005...

Отзывы: