Büchi Labortechnik AG
Operation | 6
Operation Manual Dehumidifier S-396 Nano
17/24
6
Operation
6.1
Starting the instrument
Precondition:
R
All commissioning operations have been completed. See Chapter 5 "Installation",
page 15
R
The condensate vessel is empty. See Chapter 7.2 "Empty the condensate vessel",
page 18
u
Set the On / off master switch to On.
ð
The compressor is starting up.
ð
The outlet hoses gets cold.
6.2
Shutting down the instrument
u
Set the On / Off master switch to Off.
u
Wait until the instrument is the same as the ambient temperature.
u
Empty the condensate vessel. See Chapter 7.2 "Empty the condensate vessel",
page 18
Содержание S-396 Nano
Страница 1: ...Dehumidifier S 396 Nano Operation Manual 11594350 A en ...
Страница 23: ......