5 | Installation
NIR-Online GmbH
20/36
Operation Manual Process Analyser X-One
5.3
Establishing installation point
The fixing points or bolts conform to M6 A2-70/7.3 Nm.
Establish the installation point according to the specified data of the flange.
40
60
R6
0
15°
15°
140
Fig. 5: Dimensions of flange
Содержание NIR-Online X-One
Страница 1: ...NIR Online Process Analyser X One Operation Manual 11593995 C en...
Страница 35: ......