2
2.
Connect the hose connectors to the inlet and outlets tubes of each pump head as illustrated above.
3.
Proceed to connect the PVC line to each connector. Each PVC line should be cut to the appropriate length of
your configuration.
4.
When facing of the pump heads, the PVC line connected to the inlet port on the left side needs to be routed to
your supply of additives. Whereas, the line connected to the right outlet should be routed to your tank.
NOTE: The pump is designed for aquarium additives only. Strong acids or other chemicals like alkali
solutions are not suitable.
5.
Lastly, connect the power transformer/supply to the unit. Double check all your connections to ensure that
they are safe and secure.
6.
Turn on the unit. The screen should show the clock as 00:00:00 (initial state).
Clock settings:
1.
In the initial state, press ESC key, and then press the UP or DOWN button until the screen display SETUP
CLOCK.
2.
Press the ENTER button to access the clock setting mode. Press UP or DOWN to increase or decrease the
values.
3.
Press ENTER to confirm and proceed to the next digit.
4.
To finalize your adjustments, press ENTER again to exit the clock adjustment
Manual control mode (for priming or testing):
1.
In the initial state, press ESC, select MANUAL CONTORL, and press ENTER.
Bubble-Magu
s
00:00:0
0
SetClock
10:00
MANUAL
CONTOR
L