T:  866-360-5675 email: [email protected] web: www.bsesales.com 

The recommended height top is not to exceed 

11

feet 

from the floor.

Ionization Placement & 
Clearance  

BSE units should not be located near to air exhausting inlets of other HVAC equipment. Supply air 
outlets can be configured to aid the ionized air disbursement in a uniform manner.  Ionizer should 
be oriented such that the outlet is slightly below any ceiling fans. Exhaust fan inlets or other return 
air points creating a negative pressure should not be within 4.5 times the width of the ionization 
unit. Proper systems orientation will provide an enhancement to the Indoor Air Quality (IAQ) and 
occupant comfort.  

Figure 8: Installing BA-350.

Required Clearances for Mini

Figure 9: Installing BA-350.

Required Clearances for BA-350

See the figure on the left for required clearance 

distances around an installed Mini wall-mounted unit.

There must be a minimum clearance of 2 inches
from the top of the Mini unit to the ceiling.

Clearance gap between any wall or enclosure and
the left or right side of the unit must be greater
than 2 feet.

The base of the unit must be at least 

7.0 feet

 from

the floor for adequate disbursement.

The recommended height top is not to exceed 

11

feet 

from the floor.

Required Clearances for Max Ceiling 

Mounted Unit  

See the figure on the right for required distances around 

Mini ceiling-mounted unit.

There must be placed slightly below any ceiling
fans.

The base of the unit must be at least 

7.0 feet

 from

the floor for adequate disbursement.

Inspection 

2” 

2'

2' 

Содержание Crystal Clean Air BA-1000

Страница 1: ...e Suite 108 Schaumburg IL 60173 T 866 360 5675 email bsesales com web www bsesales com Ionization Unit Installation Manual Crystal Clean Air Ionization Unit BA 800 BA 1000 Crystal Clean Air BA 350 Cus...

Страница 2: ...l bsesales com web www bsesales com PROPRIETARY DATA NOTICE This document as well as all reports illustrations data information and other materials are the property of BSE Inc Please read carefully an...

Страница 3: ...ING CAUTION Installation DANGER Do not use or store flammable gas or combustibles near the unit There is risk of product failure fire explosion and physical injury or death WARNING Do not install remo...

Страница 4: ...dedicated power source that provides adequate power Refer to local state and federal codes and use power wires of sufficient current capacity and rating Secure all field wiring connections with appro...

Страница 5: ...Installation guide One 1 Each Variable Speed Controller Wireless Remote Note Hardware Not Supplied Crystal Clean Air BA 350 Installation guide One 1 Each Mounting plate One 1 Each Note Hardware Not S...

Страница 6: ...6 360 5675 email bse bsesales com web www bsesales com Crystal Clean Air Accessories Crystal Clean Air BA 1000 External Dimensions inches Figure 5 Dimensions Crystal Clean Air BA 1000 External Dimensi...

Страница 7: ...Clearances for Max Figure 8 Installing Max Wall Mounted Required Clearances for Max Figure 9 Installing Max Ceiling Mounted Required Clearances for Max Wall Mounted Unit See the figure on the right fo...

Страница 8: ...ment to the Indoor Air Quality IAQ and occupant comfort Figure 8 Installing BA 350 Required Clearances for Mini Figure 9 Installing BA 350 Required Clearances for BA 350 See the figure on the left for...

Страница 9: ...with filing a freight claim and to order a replacement unit 1 Before opening the shipping container verify you have the correct unit 2 Place the box on a solid surface right side up 3 Open the top of...

Страница 10: ...each of the drilled holes 3 Hold the unit in place as you drill the screws into the top left and right of the unit 4 After the top of the unit is secure attach the bottom with the remaining two 2 scre...

Страница 11: ...2 Place the mounting plate and mark the location of the four 4 holes To Ensure the unit is level use a leveling tool If mounting the unit on concrete consider using anchor bolts 3 Drill four 4 holes a...

Страница 12: ...360 5675 email sales bsesales com web www bsesales com GENERAL MANITENANCE GUIDELINES Maintenance Virtually maintenance free suggested maintenance includes spraying ionizer tips with canned air 1x ye...

Отзывы:

Похожие инструкции для Crystal Clean Air BA-1000