Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53549013-01
Printed in U.S.A.
Form II549J-12-03
Pg 1
6-2020
Replaces: II549J-12-02
Installation Instructions
CONTENTS
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . 1
DIMENSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Rated Indoor Airflow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
REFRIGERATION SYSTEM COMPONENTS . . . . . . . . 6
Reversing Valve and Check Valve Position . . . . . . . . . . . . 6
Troubleshooting Refrigerant Pressure Problems and Check
Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Refrigerant System Pressure Access Ports . . . . . . . . . . . . . 7
installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Jobsite Survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Step 1 - Plan for Unit Location . . . . . . . . . . . . . . . . . . . . . . 8
Step 2 - Plan for Sequence of Unit Installation . . . . . . . . . 8
Step 3 - Inspect Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Step 4 - Provide Unit Support . . . . . . . . . . . . . . . . . . . . . . . 8
• SLAB MOUNT (HORIZONTAL UNITS ONLY)
• ALTERNATE UNIT SUPPORT (IN LIEU OF CURB OR
Step 5 - Field Fabricate Ductwork . . . . . . . . . . . . . . . . . . 10
• UNITS WITH ACCESSORY ELECTRIC HEATERS
Step 6 - Rig and Place Unit . . . . . . . . . . . . . . . . . . . . . . . . 10
Step 7 - Convert to Horizontal and Connect Ductwork
(when required) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Step 8 - Install Outside Air Hood . . . . . . . . . . . . . . . . . . . 12
• ECONOMIZER HOOD REMOVAL AND SETUP (FAC
• TWO-POSITION DAMPER HOOD REMOVAL AND
• ECONOMIZER AND TWO-POSITION HOOD ASSEM
Step 9 - Install External Condensate Trap and Line . . . . 13
Step 10 - Make Electrical Connections . . . . . . . . . . . . . . . 14
• UNITS WITHOUT FACTORY-INSTALLED NON-
• UNITS WITH FACTORY-INSTALLED NON-FUSED
• FACTORY-OPTION THRU-BASE CONNECTIONS
• UNITS WITHOUT THRU-BASE CONNECTIONS
• UNIT WITHOUT THRU-BASE CONNECTION KIT
• CONTROL AND POWER WIRING DIAGRAMS
EconoMi$er® X (Factory Option) . . . . . . . . . . . . . . . . . . 27
• ECONOMIZER MODULE WIRING DETAILS
Smoke Detectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
• COMPLETING RETURN AIR SMOKE SENSOR
2-Speed Indoor Fan Motor System with Variable
Frequency Drive (Factory-Installed Option) . . . . . . . 40
RTU OPEN Controller (Factory option) . . . . . . . . . . . . . 40
Controller Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Step 11 - Adjust Factory-Installed Options . . . . . . . . . . . 40
• ECONOMI$ER IV OCCUPANCY SWITCH
Step 12 - Install Accessories . . . . . . . . . . . . . . . . . . . . . . . . 40
Step 13 - Check Belt Tension . . . . . . . . . . . . . . . . . . . . . . . 41
• BELT FORCE — DEFLECTION METHOD
Pre-Start and Start-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Start-Up Checklist for 549J12 Single Package Rooftop Heat
Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
START-UP CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . CL-1
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components.
Only trained and qualified service personnel should install,
repair, or service air-conditioning equipment.
Untrained personnel can perform basic maintenance functions
of cleaning coils and filters and replacing filters. All other
operations should be performed by trained service personnel.
When working on air-conditioning equipment, observe
precautions in the literature, tags and labels attached to the
unit, and other safety precautions that may apply.
Follow all safety codes, including ANSI (American National
Standards Institute) Z223.1. Wear safety glasses and work
gloves. Use quenching cloth for unbrazing operations. Have
fire extinguisher available for all brazing operations.
It is important to recognize safety information. This is the
safety-alert symbol
. When you see this symbol on the unit
and in instructions or manuals, be alert to the potential for
personal injury.
Legacy Line
549J*12
Single Package Rooftop Heat Pump
with Puron
®
(R-410A) Refrigerant
Содержание Legacy 549J 12 Series
Страница 4: ...4 Fig 2 Unit Dimensional Drawing Size 12 Units...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing Size 12 Units cont...
Страница 9: ...9 Fig 6 Roof Curb Details REV 50TM500827...
Страница 24: ...24 Fig 42 Typical 549J Control Wiring Diagram...
Страница 25: ...25 Fig 43 Typical 549J Power Wiring Diagram 208 230 3 60 unit shown...
Страница 26: ...26 Fig 44 RTU Open Controller System Wiring Diagram...