WARNING:

The unit cabinet must have an uninter-

rupted or unbroken ground to minimize personal injury if
an electrical fault should occur. The ground may consist
of electrical wire or metal conduit when installed in
accordance with existing electrical codes. Failure to
follow this warning can result in an electric shock, fire, or
death.

B.

Connect Ground and Power Wires

Connect ground wire to ground connection in control box for
safety. Connect power wiring to contactor as shown in Fig. 8.

C.

Connect Control Wiring

Route 24-v control wires through control wiring grommet and
connect leads to control wiring. (See Fig. 9–14.)

Use No. 18 AWG color-coded, insulated (35°C minimum) wire. If
thermostat is located more than 100 ft from unit, as measured
along the control voltage wires, use No. 16 AWG color-coded wire
to avoid excessive voltage drop.

All wiring must be NEC Class 1 and must be separated from
incoming power leads.

Use furnace transformer, fan coil transformer, or accessory trans-
former for control power, 24-v/40-va minimum.

NOTE:

Use of available 24-v accessories may exceed the mini-

mum 40-va power requirement. Determine total transformer load-
ing and increase the transformer capacity or split the load with an
accessory transformer as required.

IMPORTANT:

Check factory wiring and wire connections to

ensure terminations are secured properly. Check wire routing to
ensure wires are not in contact with tubing, sheet metal, etc.

XI.

COMPRESSOR CRANKCASE HEATER

When equipped with a crankcase heater, furnish power to heater a
minimum of 24 hr before starting unit. To furnish power to heater
only, set thermostat to OFF and close electrical disconnect to
outdoor unit.

A crankcase heater is required if refrigerant tubing is longer than
50 ft.

XII.

INSTALL ELECTRICAL ACCESSORIES

Refer to the individual instructions packaged with kits or acces-
sories when installing.

XIII.

START-UP

CAUTION:

To prevent compressor damage or personal

injury, observe the following:
• Do not overcharge system with refrigerant.
• Do not operate unit in a vacuum or at negative pressure.
• Do not disable low-pressure switch.
In scroll compressor applications:
• Dome temperatures may be hot.

CAUTION:

To prevent personal injury wear safety

glasses, protective clothing, and gloves when handling
refrigerant and observe the following:
• Back seating service valves are not equipped with
Schrader valves. Fully back seat (counter clockwise)
valve stem before removing gage port cap.
• Front seating service valves are equipped with Schrader
valves.

CAUTION:

Do not vent refrigerant to atmosphere. Re-

cover during system repair or final unit disposal.

Follow these steps to properly pumpdown a system and avoid
negative suction pressure.

1. Fully back seat (open) liquid and vapor tube service valves.

2. Unit is shipped with valve stem(s) front seated (closed) and

caps installed. Replace stem caps after system is opened to
refrigerant flow. Replace caps finger-tight and tighten with
wrench an additional 1/12 turn.

3. Close electrical disconnects to energize system.

4. Set room thermostat to desired temperature. Be sure set

point is below indoor ambient temperature.

5. Set room thermostat to HEAT or COOL and fan control to

ON or AUTO mode, as desired. Operate unit for 15
minutes. Check system refrigerant charge.

A.

Sequence of Operation

NOTE:

Defrost control board may be equipped with 5-minute

lockout timer which may be initiated upon any interruption of
power.

With power supplied to indoor and outdoor units, transformer is
energized.

COOLING

On a call for cooling, thermostat makes circuits R-O, R-Y, and
R-G. Circuit R-O energizes reversing valve, switching it to cooling
position. Circuit R-Y energizes contactor, starting outdoor fan
motor and compressor circuit. R-G energizes indoor unit blower
relay, starting indoor blower motor on high speed.

When thermostat is satisfied, its contacts open, de-energizing the
contactor and blower relay. Compressor and motors should stop.

NOTE:

If indoor unit is equipped with a time-delay relay circuit,

the blower runs an additional 90 sec to increase system efficiency.

HEATING

On a call for heating, thermostat makes circuits R-Y and R-G.
Circuit R-Y energizes contactor, starting outdoor fan motor and
compressor. Circuit R-G energizes indoor blower relay, starting
blower motor on high speed.

Should temperature continue to fall, R-W2 is made through
second-stage room thermostat bulb. Circuit R-W2 energizes a
sequencer, bringing on first bank of supplemental electric heat and

Fig. 8—Line Power Connections

A91056

DISCONNECT
PER N. E. C. AND/OR
LOCAL CODES

CONTACTOR

GROUND
LUG

FIELD GROUND

WIRING

FIELD POWER

WIRING

—5—

Содержание 663C

Страница 1: ...r installation of equipment 1 Locate unit away from windows patios decks etc where unit operation sounds may disturb customer 2 Ensure that vapor and liquid tube diameters are appropriate to capacity...

Страница 2: ...ing mode is 66 F V ELEVATE UNIT CAUTION Accumulation of water and ice in base pan may cause equipment damage In areas where prolonged freezing temperatures are encountered elevate unit per local clima...

Страница 3: ...1 for field tubing equivalent line length Refer to Table 2 for accessory requirements For buried line applications greater than 36 in refer to Table 2 and Residential Split System Buried Line Applicat...

Страница 4: ...AND RECOMMENDED LIQUID AND VAPOR TUBE DIAMETERS IN UNIT SIZE LIQUID VAPOR VAPOR LONG LINE Connection Diameter Tube Diameter Connection Diameter Tube Diameter Connection Diameter Tube Diameter 018 3 8...

Страница 5: ...afety glasses protective clothing and gloves when handling refrigerant and observe the following Back seating service valves are not equipped with Schrader valves Fully back seat counter clockwise val...

Страница 6: ...P FA FB FC FD FF FH FAN COIL HEAT PUMP G Y1 W2 L R O INDOOR FAN HEAT STAGE 2 COOL HEAT STAGE 1 NOT USED 24 VAC COM NOT USED TROUBLE OPTIONAL OUTDOOR SENSOR CONNECTION Y C C IF AVAILABLE A97372 24 VAC...

Страница 7: ...R C W2 Y G R C RVS COOLING C W2 OTHER HP THERMOSTAT FA FB FC FD FF FH FAN COIL HEAT PUMP G O E W2 E W3 R Y 24 VAC COM HEAT STAGE 2 COOL HEAT STAGE 1 INDOOR FAN EMERGENCY HEAT O IF AVAILABLE A97373 24...

Страница 8: ...xiliary heat for even heating comfort via W W1 and Y1 W2 Refer to FK4 Installation Instructions Fig 11 Typical 24 v Circuit Connections using Bryant Model DF Thermostat with Single or 2 Stage Furnace...

Страница 9: ...ONNECTION CUT JW1 SHR SHR ODT A97407 24 VAC HOT R G W W1 Y Y2 O W2 RVS COOLING C B S1 S2 BRYANT PROGRAMMABLE THERMOSTAT MODEL HP FA FB FC FH FAN COIL WITH SMART HEAT HEAT PUMP Y1 W2 L R C Y G O W2T W3...

Страница 10: ...VAC COM HEAT STAGE 2 CUT JW1 SHR SHR FA FB FC FH FAN COIL SMART HEAT ODT A97410 24 VAC HOT R C Y G O RVS COOLING W2 OTHER HP THERMOSTAT FA FB FC FH FAN COIL SMART HEAT HEAT PUMP E R C Y G O W2T W3 W2D...

Страница 11: ...rewdriver immediately otherwise control will terminate normal 10 minute defrost cycle in approximately 2 sec NOTE Length of defrost cycle is dependent on the length of time it takes to remove screwdri...

Страница 12: ...rging is necessary during heating season charge must be weighed in accordance with unit rating plate 0 6 oz ft of 3 8 in liquid line above or below 15 ft respectively EXAMPLE To calculate additional c...

Отзывы: